D9019 - 1970
January
1 - | |
2 - | |
3 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
s4 - | 1L16 13:20 King's Cross - Bradford. |
5 - | |
6 - | |
7 - | |
8 - | |
9 - | |
10 - | |
s11 - | |
12 - | |
13 - | |
14 - | To Doncaster Works - Unclassified repair. No shopping proposal - No.1 power unit 413 replaced by 419. |
15 - | Doncaster Works. |
16 - | Doncaster Works. |
17 - | Released from Doncaster Works. |
s18 - | |
19 - | |
20 - | 1S60 19:40 King’s Cross - Aberdeen, "The Aberdonian" to Edinburgh. |
21 - | |
22 - | |
23 - | |
24 - | |
s25 - | |
26 - | |
27 - | |
28 - | |
29 - | |
30 - | |
31 - |
February
s1 - | Doncaster TMD. Tyre turning. |
2 - | |
3 - | |
4 - | To Doncaster Works - Unclassified repair. No.2 power unit 423 internal coolant leak and oil sump overflowing - 423 replaced by 425 and lubricating oil tank and radiators were cleaned. |
5 - | Released from Doncaster Works. |
6 - | |
7 - | |
s8 - | |
9 - | |
10 - | |
11 - | |
12 - | |
13 - | |
14 - | |
s15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | |
21 - | |
s22 - | |
23 - | |
24 - | |
25 - | |
26 - | |
27 - | |
28 - | 1E11 12:00 Edinburgh - King's Cross. |
March
s1 - | |
2 - | |
3 - | |
4 - | |
5 - | |
6 - | |
7 - | 1A21 11:55 Bradford - King's Cross. |
s8 - | |
9 - | |
10 - | |
11 - | |
12 - | |
13 - | |
14 - | |
s15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | |
21 - | 1A22 11:00 Newcastle - King's Cross. |
s22 - | |
23 - | |
24 - | |
25 - | |
26 - | 1S35 14:00 King’s Cross - Edinburgh. |
27 - | |
28 - | 1S16 08:00 King's Cross - Edinburgh. |
s29 - | |
30 - | |
31 - |
April
1 - | |
2 - | |
3 - | |
4 - | |
s5 - | |
6 - | |
7 - | |
8 - | To Doncaster Works - Unclassified repair. No.1 power unit 419 aerating badly and losing coolant due to a suspected fractured liner - 419 replaced by 456, lubricating oil tank and radiators were cleaned, the high water temperature capillary tube was re-sited clear of main generator and the boiler blow-down pipe was extended clear of the tank. |
9 - | Released from Doncaster Works. 1A07 07:25 Newcastle - King's Cross. |
10 - | |
11 - | 1N10 11:00 King's Cross - Newcastle (still carrying 'D' prefix at this time). |
s12 - | |
13 - | 1A06 08:00 York - King's Cross. |
14 - | 1E25 16:00 Edinburgh - King's Cross. |
15 - | |
16 - | |
17 - | |
18 - | 1E17 10:30 Aberdeen - King's Cross, from Edinburgh. |
s19 - | 1S17 10:00 King's Cross - Aberdeen, to Edinburgh. |
20 - | |
21 - | |
22 - | |
23 - | |
24 - | |
25 - | |
s26 - | |
27 - | To Doncaster Works - Intermediate repair. No shopping proposal - power units No.1 456 replaced by 413 & No.2 425 replaced by 418, bogies No.1 9000-27 and No.2 9000-28 were given General repairs and boiler 1495/J2951 was replaced by 1497/J2953. The body was given an Intermediate repair - the 'D' prefix is most likely to have been dropped from the number at this time. |
28 - | Doncaster Works. |
29 - | Doncaster Works. |
30 - | Doncaster Works. |
May
1 - | Doncaster Works. |
2 - | Doncaster Works. |
s3 - | Doncaster Works. |
4 - | New
timetable period. Doncaster Works. |
5 - | Doncaster Works. |
6 - | Doncaster Works. |
7 - | Doncaster Works. |
8 - | Doncaster Works. |
9 - | Doncaster Works. |
s10 - | Doncaster Works. |
11 - | Doncaster Works. |
12 - | Doncaster Works. |
13 - | Doncaster Works. |
14 - | Doncaster Works. |
15 - | Doncaster Works. |
16 - | Doncaster Works. |
s17 - | Doncaster Works. |
18 - | Doncaster Works. |
19 - | Released from Doncaster Works. 1A29 16:30 Doncaster - King's Cross, to Peterborough (piloting). 0D01 Peterborough - Doncaster. |
20 - | 0B01 Doncaster - King's Cross. |
21 - | |
22 - | |
23 - | Doncaster TMD. Tyre turning. 0B02 Doncaster - Finsbury Park. Finsbury Park TMD. |
s24 - | |
25 - | |
26 - | 1E25 16:00 Edinburgh - King's Cross. |
27 - | |
28 - | 1E17 10:30 Aberdeen - King's Cross, from Edinburgh. |
29 - | |
30 - | 1E07 10:10 Edinburgh - King's Cross. |
s31 - | 1L39 22:45 King's Cross - Leeds. Drivers safety device defective owing to defective potted relay - 25 minute delay. |
June
1 - | 1L33 17:05 King's Cross - Bradford. |
2 - | |
3 - | |
4 - | |
5 - | |
6 - | |
s7 - | |
8 - | |
9 - | |
10 - | |
11 - | |
12 - | |
13 - | |
s14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | Official Records: 1970 Period 6 (24/05 -
20/06); Casualties for the period totalled 30, compared with 22 for
period 5. Locomotives 9001, 9005, 9007, 9009, 9015, 9018 and 9021 were not involved in any mechanical casualty. 9017 was also stated, however, two mechanical failures were reported for investigation dated 01/06 & 02/06. Flashovers for the period were 9006 02/06 and 9011 20/06. |
s21 - | |
22 - | |
23 - | |
24 - | |
25 - | 1L13 11:30 King's Cross - Harrogate, to Leeds. |
26 - | |
27 - | |
s28 - | |
29 - | |
30 - |
July
1 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
2 - | |
3 - | |
4 - | |
s5 - | |
6 - | |
7 - | 1A35 17:05 Newcastle - King's Cross. High water temp. due to dirty radiator elements - 3 minute delay Doncaster. |
8 - | |
9 - | |
10 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
11 - | 1S20 10:10 King's Cross - Edinburgh. |
s12 - | 1S32 12:00 King's Cross - Edinburgh. |
13 - | |
14 - | |
15 - | 1A04 07:15 Bradford - King's Cross. |
16 - | |
17 - | |
18 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". |
s19 - | |
20 - | |
21 - | |
22 - | 1A03 07:25 Leeds - King's Cross. Circuit breaker tripped on starting No.2 engine - 10 minute delay Leeds and possible removal from service. |
23 - | |
24 - | |
25 - | |
s26 - | |
27 - | |
28 - | |
29 - | |
30 - | |
31 - |
August
1 - | |
s2 - | |
3 - | |
4 - | |
5 - | |
6 - | |
7 - | 1A15 09:10 Newcastle - King's Cross, "The Tees-Tyne
Pullman". 1L33 17:05 King's Cross - Bradford. |
8 - | 1A30 15:10 Newcastle - King's Cross. |
s9 - | |
10 - | |
11 - | 1S42 16:00 King's Cross - Edinburgh. |
12 - | |
13 - | |
14 - | |
15 - | |
s16 - | |
17 - | 1S16 08:00 King's Cross - Edinburgh. |
18 - | |
19 - | |
20 - | |
21 - | |
22 - | |
s23 - | |
24 - | |
25 - | |
26 - | |
27 - | 1E11 12:00 Edinburgh - King's Cross. |
28 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman" (not carrying 'D' prefix by this time). |
29 - | |
s30 - | |
31 - | 1E11 12:00 Edinburgh - King's Cross. PIC |
September
1 - | 1E01 08:00 Edinburgh - King's Cross. PIC |
2 - | 1E01 08:00 Edinburgh - King's Cross. Vacuum gauge defective - 10 minute delay Edinburgh. |
3 - | |
4 - | |
5 - | |
s6 - | Haymarket TMD. |
7 - | |
8 - | |
9 - | 1E25 Edinburgh - King's Cross, (to York). Low in power and earth fault traction motor - 15 minute delay Tollerton and possible removal from service at York. |
10 - | |
11 - | 1E01 08:00 Edinburgh - King's Cross. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". Gateshead TMD. |
12 - | Gateshead TMD. 1S30 08:30 Newcastle - Edinburgh. PIC Haymarket TMD. 1E15 13:45 Edinburgh - King's Cross. |
s13 - | |
14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
19 - | 1E17 10:30 Aberdeen - King's Cross, from Edinburgh. |
s20 - | |
21 - | |
22 - | 1S66 20:20 King's Cross - Edinburgh. |
23 - | |
24 - | |
25 - | |
26 - | |
s27 - | 1S66 20:20 King's Cross - Edinburgh. Partial loss of power (fault self rectified) - 28 minute delay Grantham. |
28 - | |
29 - | |
30 - |
October
1 - | 1S16 08:00 King's Cross - Edinburgh. Loss of power; regulator air pipe holed - 39 minute delay Grantham & 9 minute delay Doncaster. |
2 - | |
3 - | |
s4 - | |
5 - | |
6 - | |
7 - | |
8 - | Released from Doncaster Works. Unclassified repair: No shopping proposal - No.2 power unit 418 replaced by 425. Date to works unrecorded. |
9 - | 1E01 08:00 Edinburgh - King's Cross. 1S42 16:00 King's Cross - Edinburgh. Haymarket TMD. |
10 - | Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross. |
s11 - | Finsbury Park TMD. 0D01 Finsbury Park -Doncaster. |
12 - | To Doncaster Works - Unclassified repair. No.1 power unit 413 main generator brush ring badly burnt - 413 replaced by 404 and flashover damage on No.2 main generator repaired. |
13 - | Doncaster Works. |
14 - | Released from Doncaster Works. |
15 - | |
16 - | |
17 - | 1S66 20:30 King's Cross - Edinburgh (to?). Proportional relay valve exhaust seat adrift - 66 minute delay and possible removal from service. |
s18 - | |
19 - | |
20 - | |
21 - | |
22 - | To Doncaster Works - Unclassified repair. No.1 power unit 404 dephased and fuel coming from 'A' & 'C' manifold drains - 404 replaced by 433, radiator fan shaft bearings at No.1 end replaced and leaks on steam heater pipe repaired. |
23 - | Doncaster Works. |
24 - | Doncaster Works. |
s25 - | Released from Doncaster Works. |
26 - | |
27 - | |
28 - | |
29 - | |
30 - | |
31 - | 1E39 22:30 Edinburgh - King's Cross, (to Hitchin). Short of fuel - 6 minute delay Hitchin (01/11) and possible removal from service. |
November
s1 - | |
2 - | |
3 - | |
4 - | |
5 - | |
6 - | 1L03 07:55 King's Cross - Bradford. 1A20 10:45 Bradford - King's Cross. 1N27 18:00 King's Cross - Newcastle. Gateshead TMD. |
7 - | Gateshead TMD. 1A12 08:10 Newcastle - King's Cross. 1S42 16:00 King's Cross - Edinburgh. |
s8 - | |
9 - | |
10 - | |
11 - | |
12 - | |
13 - | |
14 - | |
s15 - | 1E17 09:30 Aberdeen - King's Cross, from Edinburgh (via Carlisle). |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | |
21 - | |
s22 - | |
23 - | |
24 - | |
25 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman",
(to Newcastle). Crankcase split on No.2 engine 425 (3050hrs) - 7 minute delay Morpeth. |
26 - | To Doncaster Works - Light repair. No shopping proposal - power units No.1 433 replaced by 435 & No.2 425 replaced by 420 bogies No.1 9000-27 replaced by 9000-45 & No.2 9000-28 replaced by 9000-46 and boiler 1497/J2953 was given a General repair. The body was given a Light repair and the locomotive was fitted with ETH equipment. |
27 - | Doncaster Works. |
28 - | Doncaster Works. |
s29 - | Doncaster Works. |
30 - | Doncaster Works. |
December
1 - | Doncaster Works. |
2 - | Doncaster Works. |
3 - | Doncaster Works. |
4 - | Doncaster Works. |
5 - | Doncaster Works. |
s6 - | Doncaster Works. |
7 - | Doncaster Works. |
8 - | Doncaster Works. |
9 - | Doncaster Works. |
10 - | Doncaster Works. |
11 - | Doncaster Works. |
12 - | Doncaster Works. |
s13 - | Doncaster Works. |
14 - | Doncaster Works. |
15 - | Doncaster Works. |
16 - | Doncaster Works. |
17 - | Doncaster Works. |
18 - | Doncaster Works. |
19 - | Doncaster Works. |
s20 - | Doncaster Works. |
21 - | Doncaster Works. |
22 - | Doncaster Works. |
23 - | Doncaster Works. |
24 - | Doncaster Works. |
25 - | Doncaster Works. |
26 - | Doncaster Works. |
s27 - | Doncaster Works. |
28 - | Doncaster Works. |
29 - | Doncaster Works. |
30 - | Doncaster Works. |
31 - | Doncaster Works. |
D9019
(1969).....9019 (1971)
1970.....HOME