55020 - 1976
January
| 1 - | Doncaster Works (arrive 04.12.75). |
| 2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| s4 - | Doncaster Works. |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| 9 - | Doncaster Works. |
| 10 - | Doncaster Works. |
| s11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| 14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| 16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| s18 - | Doncaster Works. |
| 19 - | Doncaster Works. |
| 20 - | Doncaster Works. |
| 21 - | Doncaster Works. |
| 22 - | Doncaster Works. |
| 23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| s25 - | Doncaster Works. |
| 26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| 28 - | Doncaster Works. |
| 29 - | Doncaster Works. |
| 30 - | Doncaster Works. |
| 31 - | Doncaster Works. |
February
| s1 - | Doncaster Works (weigh yard). |
| 2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| s8 - | Doncaster Works. |
| 9 - | Doncaster Works. |
| 10 - | Doncaster Works. |
| 11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| 14 - | Doncaster Works. |
| s15 - | Doncaster Works. |
| 16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| 19 - | Doncaster Works. |
| 20 - | Doncaster Works. |
| 21 - | Doncaster Works. |
| s22 - | Doncaster Works. |
| 23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| 25 - | Doncaster Works. |
| 26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| 28 - | Doncaster Works. |
| s29 - | Doncaster Works. |
March
| 1 - | Doncaster Works. |
| 2 - | Released from Doncaster Works. |
| 3 - | 1A08 08:30 Leeds - King's Cross. P.Ref |
| 4 - | 1L16 13:10 King's Cross - Bradford, to Leeds. |
| 5 - | Condition of locomotive following
Classified Repair report states: No.1 engine high water temperature probe leaking (new probe connection made & fitted) and No.2 engine C bank 1, 4 & 6 injectors blowing badly (new copper washers fitted). |
| 6 - | |
| s7 - | Condition of locomotive following
Classified Repair report states: broken emergency spring in M8A valve at No.1 end (valve renewed). |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | Gateshead TMD. Condition of locomotive following Classified Repair report states: loss of power only 500 amps at 60 mph. Condition of locomotive following Classified Repair report states: No.1 traction motor contactor EP valve adrift (replaced & tightened). 1S32 12:10 King's Cross - Aberdeen, "The Aberdonian" to Edinburgh. |
| s14 - | |
| 15 - | |
| 16 - | 1E05 09:45 Edinburgh -King's Cross, "The Flying Scotsman". Condition of locomotive following Classified Repair report states: Shock absorber bolt missing (bolt renewed). |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | 1A20 11:30 Leeds - King's Cross. |
| s21 - | |
| 22 - | |
| 23 - | |
| 24 - | 1E05 09:45 Edinburgh - King's Cross, "The Flying Scotsman". 1L34 18:04 King's Cross - Bradford. |
| 25 - | 1A04 07:20 Bradford - King's Cross, "The Bradford
Executive". 1S32 12:10 King's Cross - Aberdeen, "The Aberdonian" to Edinburgh. |
| 26 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". Haymarket TMD. 1E26 17:00 Edinburgh - King's Cross. |
| 27 - | 1L05 08:10 King's Cross - Leeds. |
| s28 - | |
| 29 - | |
| 30 - | |
| 31 - |
April
| 1 - | |
| 2 - | 1N08 09:00 King's Cross - Newcastle. |
| 3 - | 1N27 18:00 King's Cross - Newcastle. |
| s4 - | 1A17 10:30 Newcastle - King's Cross. Condition of locomotive following Classified Repair report states: air pipe under No.2 end controller broken (pipe repaired). |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | 1E35 20:20 Edinburgh - King's Cross. |
| 10 - | 1S16 08:00 King's Cross - Edinburgh. Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| s11 - | |
| 12 - | 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 13 - | |
| 14 - | 1S16 08:00 King's Cross - Edinburgh. Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 15 - | 1A15 09:20 Newcastle - King's Cross, "The Tees-Tyne
Pullman". 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 16 - | 1L13 11:25 King's Cross - Harrogate. 1A31 16:50 Harrogate - King's Cross. |
| 17 - | 1L13 11:25 King's Cross - Harrogate. |
| s18 - | Finsbury Park TMD. Shopping proposal dated 13.05.76 states loco off 'C' exam. |
| 19 - | 1E11 08:50 Aberdeen - King's Cross, from Edinburgh to York. |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| s25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | King's Cross Loco. PIC |
| 30 - | 1E26 17:00 Edinburgh - King's Cross. |
May
| 1 - | Condition of locomotive following
Classified Repair report states: 04.03.76-22.04.76 at various depots, various cab & engine room doors booked, wont stay shut & required draught proofing, locks & catches adjusted, wooden frames repaired & draught strips renewed. Theses doors are still being booked to date 01.05.76 - doors have been checked whilst in depot with crow bars to see if they will open but wont open unless smashing the lock assembly. Suspect twisting of frame work whilst running at speeds causes doors to jump catches causing doors to open. 1S16 08:00 King's Cross - Edinburgh. PIC Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| s2 - | 1N10 11:00 King's Cross - Newcastle. Gateshead TMD. Brake test 'B' - no adjustment left on brake adjusters, brakes to reblock. |
| 3 - | New
timetable period Gateshead TMD. Shopping proposal dated 13.05.76 states loco off 'B' exam. 1Axx Newcastle - King's Cross. King's Cross Loco. 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | 1S67 17:00 King's Cross - Edinburgh. |
| 8 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| s9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | Finsbury Park TMD. Locomotive taken out of traffic -awaiting works attention. Shopping proposal states: No.2 engine aerating (suspect liner leaking) - loco to works on No.1 engine only. |
| 14 - | To Doncaster Works - Unclassified repair. No.2 power unit 442 suspected fractured liner - 442 replaced by 409 & new brake blocks fitted. |
| 15 - | Doncaster Works. |
| s16 - | Released from Doncaster Works. 1Axx Leeds - King's Cross. |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 21 - | |
| 22 - | |
| s23 - | |
| 24 - | |
| 25 - | Finsbury Park TMD. 'B' exam & boiler J3237 on test - no repairs required. |
| 26 - | Finsbury Park TMD. Casualty report dated 02.06.76 states loco off 'B' exam. 1Sxx King's Cross - Edinburgh. Haymarket TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.1 engine suspected connecting rod adrift. |
| 27 - | To Doncaster Works - Unclassified repair. No.1 power unit 427 suspected con rod adrift - 427 replaced by 457. |
| 28 - | Released from Doncaster Works. King's Cross Loco. 'LD 125' exam - to traffic 23:20. |
| 29 - | 1N01 01:15 King's Cross - Newcastle,
to Doncaster (47544 forward). Casualty report states: boiler failed. 48,610 miles since last classified repair (02.03.76). |
| s30 - | 1A15 08:40 Newcastle - King's Cross. King's Cross Loco. 'A' exam - boiler ignition fuse loose, fuse refitted and boiler cyclic tested. 1N42 23:55 King's Cross - Newcastle, to Peterborough (8 minute delay Peterborough - 40048 forward 31/05). Casualty report states: boiler defective - low water shut down Mowbray float switch intermittently defective. 49,300 miles since last classified repair (02.03.76). Conclusions: 29.07.76 DME KX states: The defective component has been forwarded under 'Red Label' procedure - in view of the fact that this was an intermittent defect & I am satisfied that the boiler was working correctly on departure from King's Cross, I do not consider that the fitter who investigated the previous reported defect can be held at fault. |
| 31 - |
June
| 1 - | Finsbury Park TMD. Repairs - Mowbray float switch renewed. |
| 2 - | 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. |
| 3 - | 1N08 09:00 King's Cross - Newcastle. |
| 4 - | |
| 5 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| s6 - | |
| 7 - | |
| 8 - | |
| 9 - | Finsbury Park TMD. Casualty report dated 14.06.76 states loco off 'C' exam. |
| 10 - | |
| 11 - | 1L16 13:05 King's Cross - Bradford, to Leeds (27 minute delay Leeds
- 31409 forward). Casualty report states: No.1 end CCB continually tripping - insulation on wires in conduit to exhauster choke valve failed. 53,660 miles since last classified repair (02.03.76). Holbeck TMD. Repairs - cable insulation repaired. 1A35 17:40 Bradford - King's Cross, from Leeds. |
| 12 - | Finsbury Park TMD. Casualty report dated 16.06.76 states loco off exam. |
| s13 - | 1A16 10:50 Leeds - King's Cross (via Featherstone). King's Cross Loco. 1L33 17:10 King's Cross - Leeds, to Peterborough (6 minute delay Peterborough - 47436 forward). Casualty report states: No.2 engine cutting out - suspect engine aerating. 55,200 miles since last classified repair (02.03.76). Conclusions: 01.07.76 DME KX states: The loco was subsequently checked in traffic and found that No.2 engine was suspect aerating, locomotive was taken out of traffic and sent to Doncaster Works, but Works unable to fault engine after checking on load bank. This locomotive was released to traffic on 16th June but after working from Doncaster to Hull was again reported as No.2 engine shutting down. It was returned to Doncaster Depot for investigation where the fault was found to be a defective water level switch, which was changed. |
| 14 - | Finsbury Park TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.2 engine aerating & generator foot mounting broken 'A' side - to Works on No.1 engine. |
| 15 - | To Doncaster Works - Unclassified repair. No.2 power unit 409 aerating and generator foot mounting broken 'A' side - the mounting bracket was welded and a four-hour load test on No.2 power unit 409 revealed no defect. |
| 16 - | Released from Doncaster Works. Loco to Hull but returned to Doncaster with No.2 engine shutting down. Doncaster TMD. Repairs - water level switch renewed. |
| 17 - | |
| 18 - | |
| 19 - | 1A16 09:47 Harrogate - King's Cross. PIC |
| s20 - | |
| 21 - | |
| 22 - | |
| 23 - | 1L20 14:10 King's Cross - Leeds. |
| 24 - | 1L06 09:10 King's Cross - Leeds. 1A26 13:30 Leeds - King's Cross. |
| 25 - | |
| 26 - | 1D02 12:20 King's Cross - Cleethorpes. 1A34 17:42 Cleethorpes - King's Cross. |
| s27 - | |
| 28 - | |
| 29 - | |
| 30 - |
July
| 1 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". |
| 2 - | 1A03 07:30 Leeds - King's Cross, "The Leeds Executive". 1S35 14:00 King's Cross - Aberdeen. |
| 3 - | |
| s4 - | |
| 5 - | 1N27 18:00 King's Cross - Newcastle, "The Newcastle Executive". |
| 6 - | |
| 7 - | 1L16 13:05 King's Cross - Bradford, to Leeds. |
| 8 - | |
| 9 - | |
| 10 - | 1xxx King's Cross - . P.Ref |
| s11 - | |
| 12 - | |
| 13 | |
| 14 - | 1S33 13:00 King's Cross - Edinburgh. |
| 15 - | |
| 16 - | 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 17 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". PIC |
| s18 - | |
| 19 - | 1A21 11:55 Bradford - King's Cross. P.Ref |
| 20 - | |
| 21 - | Finsbury Park TMD. Casualty report dated 26.07.76 states loco off exam. 1S21 11:00 King's Cross - Edinburgh. |
| 22 - | |
| 23 - | Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman" to Newcastle (10 minute delay Newcastle - 47546 forward). Casualty report states: down on power - regulating air pipe under No.1 controller broken. Conclusions: 21.09.76 DME KX states: Failures of these pipes continues to become one of the more common sources of Deltic locomotive failures - although I understand that arrangements have been made for them to be subjected to annealing at Main Works Repairs, this has not completely cured the trouble. Gateshead TMD. Repairs - regulating air pipe removed, repaired & refitted. |
| 24 - | Gateshead TMD. |
| s25 - | Gateshead TMD. 1A22 11:30 Newcastle - King's Cross. P.Ref King's Cross Loco. 1S66 20:15 King's Cross - Edinburgh. |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
August
| s1 - | Finsbury Park TMD. P.Ref |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | 1E17 10:30 Aberdeen - King's Cross, "The Aberdonian" from Edinburgh. |
| 7 - | 1E05 09:55 Edinburgh - King's Cross, "The Flying Scotsman". |
| s8 - | 1S32 12:00 King's Cross - Edinburgh. |
| 9 - | 1A02 06:50 Hull - King's Cross, "The Hull Pullman". |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | 1A11 08:30 Newcastle - King's Cross. |
| s15 - | 1E11 12:00 Edinburgh - King's Cross. PIC |
| 16 - | |
| 17 - | 1D62 03:56 Doncaster - Hull. 1A02 06:50 Hull - King's Cross, "The Hull Pullman". |
| 18 - | |
| 19 - | Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 20 - | |
| 21 - | |
| s22 - | |
| 23 - | |
| 24 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| s29 - | |
| 30 - | |
| 31 - |
September
| 1 - | 1S21 11:00 King's Cross - Edinburgh. |
| 2 - | |
| 3 - | 1A03 07:30 Leeds - King's Cross, "The Leeds Executive". 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. |
| 4 - | 1A15 09:20 Newcastle - King's Cross. |
| s5 - | 1S42 16:00 King's Cross - Edinburgh. |
| 6 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| 7 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". 0G99 Edinburgh - Haymarket. PIC Haymarket TMD. |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | 1S33 13:00 King's Cross - Edinburgh. |
| s12 - | 1S32 12:00 King's Cross - Edinburgh, from Doncaster (ex 55008). |
| 13 - | |
| 14 - | Finsbury Park TMD. Locomotive proposed for tyre turning. |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| s19 - | |
| 20 - | 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. PIC |
| 21 - | 1E26 17:00 Edinburgh - King's Cross. |
| 22 - | |
| 23 - | |
| 24 - | 1E05 09:45 Edinburgh - King's Cross, "The Flying Scotsman". |
| 25 - | To Doncaster Works - Unclassified repair. No.2 boiler water tank fractured - this was repaired. |
| s26 - | Released from Doncaster Works. Doncaster TMD. Tyre turning. |
| 27 - | |
| 28 - | |
| 29 - | To Doncaster Works - Unclassified repair. No.1 power unit 457 con rod and crankcase fractured - 457 replaced by 429, No.1 end lubricating oil tank and radiators were cleaned, No.1 boiler water tank was repaired and No.2 main generator mounting foot bracket was welded. |
| 30 - | Doncaster Works. |
October
| 1 - | Released from Doncaster Works. |
| 2 - | 1S21 11:00 King's Cross - Edinburgh. |
| s3 - | 1S35 14:00 King's Cross - Edinburgh. |
| 4 - | |
| 5 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | 1N08 09:00 King's Cross - Newcastle. |
| s10 - | |
| 11 - | |
| 12 - | 1A03 07:30 Leeds - King's Cross, "The Leeds Executive". 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| s17 - | |
| 18 - | Gateshead TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: rough riding - No.2 end leading excess lateral movement. |
| 19 - | To Doncaster Works - Unclassified repair. Rough riding (excess lateral movement when No.2 end leading) - No.1 engine floor plate and bolster segment on both bogies were repaired. |
| 20 - | Released from Doncaster Works. |
| 21 - | |
| 22 - | |
| 23 - | 1E11 08:50 Aberdeen - King's Cross, from Edinburgh. |
| s24 - | |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| s31 - | 1E09 11:00 Edinburgh - King's Cross. |
November
| 1 - | |
| 2 - | |
| 3 - | 1S67 17:00 King's Cross - Edinburgh. |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | Finsbury Park TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.2 engine high spectro reading. |
| 12 - | To Doncaster Works - Unclassified repair. No.2 power unit 409 high spectrographic analysis - 409 replaced by 413, No.2 end lubricating oil tank was cleaned and No.2 end lubricating radiators were replaced. |
| 13 - | Doncaster Works. |
| s14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| 16 - | Released from Doncaster Works. |
| 17 - | 1S67 17:00 King's Cross - Edinburgh. |
| 18 - | |
| 19 - | |
| 20 - | 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. |
| s21 - | 1N14 15:00 King's Cross - Newcastle. |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | 1S67 17:00 King's Cross - Edinburgh. |
| 27 - | (1E11 08:50 Aberdeen - King's Cross, from Edinburgh). |
| s28 - | |
| 29 - | Haymarket TMD. 2G23 07:51 Falkirk Grahamstown - Edinburgh (vice DMU - load 6). 1E17 10:30 Aberdeen - King's Cross, "The Aberdonian" from Edinburgh. |
| 30 - | 1E22 11:26 Edinburgh - King's Cross. |
December
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| s5 - | |
| 6 - | |
| 7 - | 1A40 20:30 Newcastle - King's Cross. |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| s12 - | 1N10 11:00 King's Cross - Newcastle. |
| 13 - | |
| 14 - | 1S35 14:00 King's Cross - Aberdeen, to Edinburgh. |
| 15 - | 1A40 20:24 Newcastle - King's Cross. |
| 16 - | Doncaster TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.1 engine suspect fractured liner. To Doncaster Works - Unclassified repair. No.1 engine fractured liner - No.1 power unit 429 replaced by 410. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| s19 - | Doncaster Works. |
| 20 - | Released from Doncaster Works. |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | 1E26 17:00 Edinburgh - King's Cross. |
| 25 - | |
| s26 - | |
| 27 - | |
| 28 - | |
| 29 - | 1S12 07:45 King's Cross - Edinburgh. |
| 30 - | |
| 31 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
55020
(1975).....55020 (1977)
1976.....HOME