D9007 - 1970

D9007 (1969).....9007 (1971)

January

Click for current timetable

Deltic Diagrams

1 - Doncaster Works (arrive 31.12.69 - Unclassified repair).
2 - Released from Doncaster Works.
3 - 1E17 10:30 Aberdeen - King's Cross.
s4 -  
5 -  
6 -  
7 -  
8 -  
9 -  
10 -  
s11 -  
12 -  
13 -  
14 -  
15 - To Doncaster Works - Unclassified repair.
Both right hand side fuel tanks and boiler water tanks holed - these were repaired.
16 - Doncaster Works.
17 - Doncaster Works.
s18 - Doncaster Works.
19 - Doncaster Works.
20 - Doncaster Works.
21 - Released from Doncaster Works.
7A00 Doncaster - (Ferme Park) (noted Grantham approx 20:00 - class 7 restricted to 45mph).
22 - 1S42 16:00 King's Cross - Edinburgh.
23 -  
24 -  
s25 -  
26 -  
27 -  
28 -  
29 -  
30 -  
31 -  

February

Click for current timetable

Deltic Diagrams

s1 -  
2 -  
3 -  
4 - To Doncaster Works - Unclassified repair.
No.1 main generator armature winding down to earth - this was rectified.
5 - Doncaster Works.
6 - Released from Doncaster Works.
7 - 1L33 17:05 King's Cross - Bradford.
s8 -  
9 -  
10 -  
11 -  
12 -  
13 -  
14 - 1L33 17:05 King's Cross - Bradford.
s15 -  
16 -  
17 -  
18 -  
19 -  
20 -  
21 -  
s22 -  
23 -  
24 -  
25 -  
26 -  
27 -  
28 -  

March

Click for current timetable

Deltic Diagrams

s1 -  
2 -  
3 - 2B43 17:43 King's Cross - Peterborough.
To Doncaster Works - Unclassified repair.
No.1 power unit 418 breathing badly - 418 replaced by 456.
4 - Doncaster Works.
5 - Released from Doncaster Works.
6 -  
7 -  
s8 -  
9 -  
10 -  
11 -  
12 -  
13 -  
14 -  
s15 -  
16 -  
17 -  
18 -  
19 -  
20 -  
21 -  
s22 - Doncaster TMD.
Tyre turning.
23 -  
24 -  
25 -  
26 -  
27 - 1S42 16:00 King's Cross - Edinburgh.
28 -  
s29 -  
30 -  
31 - 1S35 14:00 King's Cross - Edinburgh.

April

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 - 1S70 22:15 King's Cross - Aberdeen, to Edinburgh.
4 - Haymarket TMD.
1E01 08:00 Edinburgh - King's Cross, to Newark (locomotive on fire). PIC
s5 -  
6 - To Doncaster Works - Intermediate repair.
Fire damage and water ingress to No.2 cubicle (following fire brigade in attendance 04/04), No.2 main
generator flashover damage and No.s 4 & 6 traction motors slight flashover damage - power units No.1
456 replaced by 423 & No.2 458 replaced by 406, bogies No.1 9000-17 & No.2 9000-18 were given
General repairs and boiler 5090/J3241 replaced by 5093/J3244. The body was given an Intermediate
repair
- the 'D' prefix is most likely to have been dropped from the number at this time.
7 - Doncaster Works.
8 - Doncaster Works.
9 - Doncaster Works.
10 - Doncaster Works.
11 - Doncaster Works.
s12 - Doncaster Works.
13 - Doncaster Works.
14 - Doncaster Works.
15 - Doncaster Works.
16 - Doncaster Works.
17 - Doncaster Works.
18 - Doncaster Works.
s19 - Doncaster Works.
20 - Doncaster Works.
21 - Doncaster Works.
22 - Doncaster Works.
23 - Doncaster Works.
24 - Released from Doncaster Works.
25 -  
s26 -  
27 -  
28 -  
29 -  
30 -  

May

Click for current timetable

Deltic Diagrams

1 -  
2 -  
s3 -  
4 - New timetable period.
5 - 1A32 17:00 Newcastle - King's Cross.
6 - 1L34 17:30 King's Cross - Harrogate, "The Yorkshire Pullman".
7 - 1A32 17:00 Newcastle - King's Cross.
8 - 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman".
9 -  
s10 -  
11 -  
12 - 1S35 14:00 King's Cross - Edinburgh.
Haymarket TMD.
13 -  
14 -  
15 -  
16 - 1A28 15:00 Bradford - King's Cross.
s17 - 1E17 09:30 Aberdeen - King's Cross, from Edinburgh (ex 1702).
18 -  
19 - 1A16 09:50 Harrogate - King's Cross, "The Yorkshire Pullman".
1S42 16:00 King's Cross - Edinburgh. 
20 -  
21 -  
22 -  
23 -  
s24 -  
25 - 1S35 14:00 King's Cross - Edinburgh.
26 -  
27 -  
28 -  
29 - 1A21 11:50 Bradford - King's Cross.
30 -  
s31 -  

June

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 -  
4 -  
5 -  
6 -  
s7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
13 -  
s14 -  
15 -  
16 -  
17 -  
18 - 1E11 12:00 Edinburgh - King's Cross.
19 -  
20 - Official Records: 1970 Period 6 (24/05 - 20/06); Casualties for the period totalled 30, compared with 22 for period 5.
Locomotives 9001, 9005, 9007, 9009, 9015, 9018 and 9021 were not involved in any mechanical casualty.
9017 was also stated, however, two mechanical failures were reported for investigation dated 01/06 & 02/06.
Flashovers for the period were 9006 02/06 and 9011 20/06.
s21 -  
22 -  
23 - To Doncaster Works - Unclassified repair.
No shopping proposal - power unit No.2 406 replaced by 446.
24 - Doncaster Works.
25 - Doncaster Works.
26 - Released from Doncaster Works.
27 -  
s28 -  
29 - 1A31 16:22 Harrogate - King's Cross.
30 -  

July

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 -  
4 - 1A41 21:24 Bradford - King's Cross.
s5 -  
6 -  
7 -  
8 -  
9 -  
10 - 1E07 10:10 Edinburgh - King's Cross.
11 - 1E01 08:00 Edinburgh - King's Cross.
1L29 16:20 King's Cross - York.
s12 -  
13 - 1A03 07:25 Leeds - King's Cross.
14 -  
15 - To Doncaster Works - Unclassified repair.
No.1 power unit 423 oil leaks - 423 replaced by 447.
16 - Doncaster Works.
17 - Released from Doncaster Works.
18 -  
s19 - 1N10 11:00 King's Cross - Newcastle.
No.2 Generator cut out switch sticking (engine run relay (ERR2) sticking - 15 minute delay King's Cross and possible
removal from service
.
20 -  
21 -  
22 -  
23 -  
24 -  
25 -  
s26 -  
27 -  
28 -  
29 -  
30 -  
31 - 1A17 09:30 Newcastle - King's Cross.

August

Click for current timetable

Deltic Diagrams

1 -  
s2 - 1A16 10:20 Bradford - King's Cross.
3 -  
4 -  
5 -  
6 -  
7 -  
8 - 1E11 12:00 Edinburgh - King's Cross.
s9 -  
10 - 1S32 12:00 King's Cross - Aberdeen, to Edinburgh.
11 -  
12 - 1E07 10:10 Edinburgh - King's Cross.
13 - 1E01 08:00 Edinburgh - King's Cross.
14 -  
15 -  
s16 -  
17 -  
18 -  
19 -  
20 -  
21 - Gateshead TMD.
22 -  
s23 - 1A40 20:20 Newcastle - King's Cross.
24 -  
25 -  
26 - 1N35 King's Cross - Newcastle (relief).
27 -  
28 -  
29 -  
s30 -  
31 - To Doncaster Works - Unclassified repair.
No.2 power unit 446 sump tank fractured - a new sump plate was fitted and a fracture in a boiler water
tank was repaired
.

September

Click for current timetable

Deltic Diagrams

1 - Doncaster Works.
2 - Released from Doncaster Works.
3 -  
4 -  
5 - 1A28 15:00 Bradford - King's Cross, from Leeds.
s6 - Haymarket TMD.
7 - 1S66 20:20 King's Cross - Edinburgh.
8 -  
9 -  
10 - 1L22 15:55 King's Cross - Harrogate, to Leeds.
Flashover main generator - 31 minute delay Essendine
.
11 -  
12 -  
s13 -  
14 - To Doncaster Works - Unclassified repair.
No.1 main generator cables from generator to No.1 end cubicle burnt, AWS cables broken - No.1 main
generator was repaired and cabling and wiring renewed. Bogies No.1 9000-17 & No.2 9000-18 had
flashover damage repaired and traction motor brushes replaced
.
15 - Doncaster Works.
16 - Doncaster Works.
17 - Doncaster Works.
18 - Released from Doncaster Works.
19 -  
s20 -  
21 -  
22 - 1A01 07:25 Lincoln - King's Cross.
23 -  
24 -  
25 -  
26 -  
s27 -  
28 -  
29 -  
30 - 1A21 11:50 Bradford - King's Cross, from Leeds.

October

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 - 1L33 17:05 King's Cross - Bradford.
s4 -  
5 -  
6 -  
7 -  
8 -  
9 - 1S16 08:00 King's Cross - Edinburgh. 
10 - 1S16 08:00 King's Cross - Edinburgh. 
s11 - 1S32 12:00 King's Cross - Edinburgh, (to?).
No.1 engine 447 (4994hrs) shut down, low coolant, due to cylinder seal leaking - 2 minute delay York and possible
removal from service
.
12 - To Doncaster Works - Unclassified repair.
No.1 power unit 447 liner seals leaking - 447 replaced by 434, oil leaks on load regulator vane motors
were repaired
.
13 - Doncaster Works.
14 - Released from Doncaster Works.
1A20 10:45 Bradford - King's Cross.
15 -  
16 -  
17 -  
s18 -  
19 -  
20 -  
21 -  
22 -  
23 -  
24 -  
s25 -  
26 -  
27 -  
28 -  
29 -  
30 -  
31 -  

November

Click for current timetable

Deltic Diagrams

s1 -  
2 -  
3 -  
4 -  
5 -  
6 - 1A03 07:25 Leeds - King's Cross.
7 - 1L34 17:30 King's Cross - Harrogate.
s8 -  
9 - To Doncaster Works - Unclassified repair.
Collision damage: both buffer beams bent - collision damage repaired as was a fracture in No.1 boiler
water tank. Oil leaks on No.s 1 & 2 load regulators were also repaired
.
10 - Doncaster Works.
11 - Doncaster Works.
12 - Doncaster Works.
13 - Released from Doncaster Works.
14 -  
s15 - 1S35 14:00 King's Cross - Edinburgh.
16 -  
17 - 1L22 15:55 King's Cross - Harrogate, to Leeds
18 -  
19 -  
20 -  
21 -  
s22 -  
23 -  
24 -  
25 -  
26 -  
27 -  
28 -  
s29 -  
30 -  

December

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 -  
4 - To Doncaster Works - Unclassified repair.
No.2 power unit 446 coolant in 'B' bank manifold - 446 replaced by 424.
5 - Released from Doncaster Works.
s6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
s13 - 1E07 11:00 Edinburgh - King's Cross, to York (speedo defect).
York TMD.
14 -  
15 -  
16 -  
17 -  
18 -  
19 -  
s20 -  
21 - Doncaster TMD.
Tyre turning.
1S66 20:20 King's Cross - Edinburgh.
22 -  
23 -  
24 -  
25 -  
26 -  
s27 -  
28 -  
29 -  
30 - 1E42 19:15 Aberdeen - King's Cross, from Edinburgh.
31 -  

D9007 (1969).....9007 (1971)
1970.....HOME