|
55007 (D9007) "PINZA" awaits attention at Doncaster Works on the 20th January 1979. The locomotive arrived at Doncaster for attention on the 6th January with power units No.1 (426) sump holed and No.2 (445) passing oil. 55007 was released on 1st February after 426 was replaced by 538 and 445 by 418.