_________________ D5902 _________________

English Electric No. 2379.

Built: Vulcan Foundry, Newton-le-Willows.

Date To Service: 01.05.59.

Original Allocation: 34B (Hornsey).

Date Withdrawn: 23.11.69.

Allocation History

34B 1/5/59. 34G 4/60, engine failure 1962. Stored Stratford then to Vulcan Foundry for refurbishment 7/63. 34G late 1964. Stored Hitchin shed 1/69-16/11/69 for loose tyres. Withdrawn 23/11/69. Stored Stratford DRS 11/69-9/70. To G. Cohen 2/9/70. Locomotive cut-up at G. Cohen, Kettering 10/70.

Photographs of D5902 on this site...

  D5902 King's Cross 22.04.60

D5902 and D5908 Stratford 20.07.63

D5902 Peterborough 1964

  D5902 Peterborough 1964

D5902 King's Cross 07/66

D5902 Dalston Junction 03/69

D5902 Stratford 07.06.70

D5902 Stratford 07/70

D5902 Stratford c1970

D5902 Stratford c1970

D5902 Cohens Kettering 12.11.70

LOCOMOTIVES.....HOME