D9011 - 1963
January
1 - | 1A51 16:00 Edinburgh - King's Cross, "The Talisman" to York (engine failure - D390 forward). |
2 - | |
3 - | |
4 - | To Doncaster Works - Unclassified repair. No.1 bogie 1011 outside spring plank out of position at both sides - the leading transom beam was re-seated on swing link and a traction motor door catch was fitted. The locomotive mileage was recorded as 159,560 miles. Released from Doncaster Works. 1A53 20:20 Newcastle - King's Cross (noted failed at Darlington). 1A76 23:20 King's Cross - Edinburgh (from - or 03/01?). |
5 - | |
s6 - | |
7 - | |
8 - | |
9 - | |
10 - | |
11 - | |
12 - | 4S19. |
s13 - | |
14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
s20 - | |
21 - | |
22 - | |
23 - | |
24 - | |
25 - | 1E15 17:00 Bradford - King's Cross, from Leeds. |
26 - | 4S19 (noted Darlington). |
s27 - | |
28 - | |
29 - | |
30 - | |
31 - |
February
1 - | 1B11 16:28 Doncaster - King's Cross. |
2 - | |
s3 - | |
4 - | |
5 - | |
6 - | |
7 - | |
8 - | |
9 - | 1A21 09:40 Newcastle - King's Cross. |
s10 - | 1A49 15:56 Newcastle - King's Cross. |
11 - | |
12 - | 1E14 11:00 Glasgow Queen St. - King's Cross, "The Queen of Scots
Pullman" to Leeds. (1E68 17:10 Leeds - Doncaster). (1E31 17:07 Hull - King's Cross, from Doncaster). |
13 - | |
14 - | |
15 - | 1A42 15:00 King's Cross - Newcastle. |
16 - | |
s17 - | |
18 - | |
19 - | |
20 - | 1A46 16:00 King's Cross - Edinburgh, "The Talisman". |
21 - | |
22 - | |
23 - | |
s24 - | |
25 - | To Doncaster Works - Unclassified repair. Leaking boiler tubes and coolant water leaks on both engines - boiler 1496/2952 had tubes welded and was acid washed. The locomotive mileage was recorded as 169,030 miles. |
26 - | Doncaster Works. |
27 - | Doncaster Works. |
28 - | Released from Doncaster Works. |
March
1 - | |
2 - | 1A21 09:40 Newcastle - King's Cross. |
s3 - | |
4 - | |
5 - | |
6 - | |
7 - | |
8 - | |
9 - | 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
s10 - | |
11 - | |
12 - | To Doncaster Works - Unclassified repair. Bogies No.1 1011 & No.2 1012 transom beam fractures - 1011 replaced by 1035 & No.2 1012 replaced by 1036. The locomotive mileage was recorded as 171,150 miles. Released from Doncaster Works. |
13 - | |
14 - | |
15 - | 1A54 17:35 King's Cross - Newcastle. |
16 - | |
s17 - | |
18 - | |
19 - | |
20 - | |
21 - | |
22 - | |
23 - | 1A12 09:00 King's Cross - Newcastle. |
s24 - | |
25 - | To Doncaster Works - General repair. No shopping proposal - power units No.1 429 replaced by 408 & No.2 405 replaced by 425, bogies No.1 1035 replaced by 1002 & No.2 1036 replaced by 1049 and boiler 1496/J2952 was replaced by 1486/J2942. The body was given an annual repair and the following modifications were carried out: AWS positioning; Sand trap positioning; Soundproofing; Cubicle sealing; Side air ducting; Exhaust tank drains; Radiator fan grills; Extra exhaust filter; Water contents gauge. |
26 - | Doncaster Works. |
27 - | Doncaster Works. |
28 - | Doncaster Works. |
29 - | Doncaster Works. |
30 - | Doncaster Works. |
s31 - | Doncaster Works. |
April
1 - | Doncaster Works. |
2 - | Doncaster Works. |
3 - | Doncaster Works. |
4 - | Doncaster Works. |
5 - | Doncaster Works. |
6 - | Released from Doncaster Works. |
s7 - | |
8 - | |
9 - | |
10 - | |
11 - | 1A50 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
12 - | (Sunday service). |
13 - | |
s14 - | |
15 - | 1A49 16:55 Newcastle - King's Cross. |
16 - | |
17 - | 1A23 08:30 Edinburgh - King's Cross, "The Talisman". 1A54 17:35 King's Cross - Newcastle. |
18 - | |
19 - | 1A50 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
20 - | |
s21 - | |
22 - | |
23 - | 1A49 16:55 Newcastle - King's Cross. |
24 - | 1A49 16:55 Newcastle - King's Cross. |
25 - | |
26 - | 1N03 07:45 King's Cross - Bradford, "The West Riding". 1E10 12:17 Harrogate - King's Cross (small yellow warning panels). PIC |
27 - | |
s28 - | |
29 - | 1A46 16:00 King's Cross - Edinburgh, "The Talisman". |
30 - |
May
1 - | |
2 - | |
3 - | 1A54 17:35 King's Cross - Newcastle. |
4 - | |
s5 - | |
6 - | 1A49 16:55 Newcastle - King's Cross. |
7 - | 1A49 16:55 Newcastle - King's Cross. |
8 - | |
9 - | |
10 - | |
11 - | |
s12 - | |
13 - | |
14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
s19 - | |
20 - | To RSH Darlington Works - Unclassified repair. Nameplates fitted. |
21 - | RSH Darlington Works. |
22 - | RSH Darlington Works. |
23 - | RSH Darlington Works. |
24 - | RSH Darlington Works. |
25 - | Released from RSH Darlington Works. |
s26 - | |
27 - | |
28 - | Named "THE ROYAL
NORTHUMBERLAND FUSILIERS" with ceremony at
Newcastle. 1A37 12:35 Newcastle - King's Cross, "The Northumbrian" (to York). 3G32 16:23 York - Newcastle (noted Darlington). |
29 - | |
30 - | |
31 - | 1A54 17:35 King's Cross - Newcastle. P.Ref |
June
1 - | |
s2 - | |
3 - | |
4 - | 1A15 09:20 Newcastle - King's Cross, "The Tees-Tyne Pullman". 1A42 15:00 King's Cross - Newcastle. P.Ref |
5 - | 1A03 07:50 Newcastle - King's Cross. |
6 - | |
7 - | 1A50 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
8 - | |
s9 - | |
10 - | 1A49 16:55 Newcastle - King's Cross. |
11 - | 1A49 16:55 Newcastle - King's Cross. |
12 - | |
13 - | |
14 - | 1A49 16:55 Newcastle - King's Cross. |
15 - | |
s16 - | |
17 - | New timetable period. |
18 - | |
19 - | |
20 - | |
21 - | |
22 - | |
s23 - | |
24 - | |
25 - | |
26 - | |
27 - | |
28 - | |
29 - | |
s30 - |
July
1 - | |
2 - | |
3 - | |
4 - | |
5 - | 1A50 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
6 - | 1A42 15:00 King's Cross - Newcastle. |
s7 - | |
8 - | |
9 - | |
10 - | |
11 - | |
12 - | |
13 - | |
s14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | 1A22 11:00 King's Cross - Glasgow Queen St. |
s21 - | 1A75 19:15 Aberdeen - King's Cross, from Edinburgh. |
22 - | 1A50 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
23 - | |
24 - | 1A06 08:00 King's Cross - Edinburgh, "The Talisman". |
25 - | 1A53 20:20 Newcastle - King's Cross. |
26 - | 1A82 23:55 King's Cross - Newcastle. |
27 - | Gateshead TMD. 1A19 10:10 Newcastle - King's Cross. 1Axx King's Cross - Newcastle. |
s28 - | 1A53 20:17 Newcastle - King's Cross. |
29 - | |
30 - | |
31 - |
August
1 - | |
2 - | 1A12 09:00 King's Cross - Newcastle. Gateshead TMD. 1A49 16:55 Newcastle - King's Cross. |
3 - | |
s4 - | |
5 - | |
6 - | |
7 - | |
8 - | |
9 - | |
10 - | |
s11 - | |
12 - | 1A21 10:15 Newcastle - King's Cross. |
13 - | |
14 - | |
15 - | 1N24 17:25 King's Cross - Harrogate, "The Yorkshire Pullman". |
16 - | 1N24 17:25 King's Cross - Harrogate, "The Yorkshire Pullman" to Leeds. |
17 - | |
s18 - | |
19 - | |
20 - | |
21 - | |
22 - | |
23 - | 1A21 10:15 Newcastle - King's Cross. |
24 - | |
s25 - | |
26 - | |
27 - | |
28 - | |
29 - | |
30 - | |
31 - | 1E30 14:23 Hull - King's Cross. |
September
s1 - | |
2 - | |
3 - | |
4 - | |
5 - | |
6 - | |
7 - | 1A03 08:00 Newcastle - King's Cross. |
s8 - | 1N07 09:40 King's Cross - Harrogate, "The Harrogate Sunday
Pullman". 1A31 11:40 Newcastle - King's Cross (from). |
9 - | New timetable period. |
10 - | |
11 - | |
12 - | |
13 - | |
14 - | |
s15 - | |
16 - | To Doncaster Works - Light repair. No.1 traction motor armature down to earth - bogies No.1 1002 replaced by 1033 & No.2 1049 replaced by 1034. The body was given a six-monthly exam. |
17 - | Doncaster Works. |
18 - | Released from Doncaster Works. |
19 - | |
20 - | |
21 - | |
s22 - | |
23 - | |
24 - | |
25 - | |
26 - | |
27 - | |
28 - | |
s29 - | |
30 - |
October
1 - | |
2 - | |
3 - | |
4 - | |
5 - | 1A12 09:00 King's Cross - Newcastle. |
s6 - | |
7 - | |
8 - | |
9 - | 1N24 17:37 King's Cross - Harrogate, "The Yorkshire Pullman" to Leeds. |
10 - | |
11 - | |
12 - | |
s13 - | |
14 - | |
15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
s20 - | 1A43 13:15 Newcastle - King's Cross. |
21 - | |
22 - | |
23 - | |
24 - | |
25 - | |
26 - | |
s27 - | |
28 - | To Doncaster Works - Unclassified repair. All traction motors to be overhauled and boiler modifications - boiler 1486/J2942 replaced by 5096/J3247. The following modifications were carried out: Brush type buffers; Modified cowlings; caustic injection to boiler; modified air ducting to boiler. The locomotive mileage was recorded as 220,000 miles. |
29 - | Doncaster Works. |
30 - | Doncaster Works. |
31 - | Doncaster Works. |
November
1 - | Doncaster Works. |
2 - | Doncaster Works. |
s3 - | Released from Doncaster Works. |
4 - | |
5 - | |
6 - | 1E18 21:23 Bradford - King's Cross, from Leeds to Doncaster (removed due to defective boiler). |
7 - | |
8 - | 1A12 09:00 King's Cross - Newcastle. |
9 - | |
s10 - | |
11 - | |
12 - | |
13 - | |
14 - | |
15 - | |
16 - | |
s17 - | |
18 - | |
19 - | To Doncaster Works - Unclassified repair. No.4 traction motor holed and all traction motors to be examined (No.s 3 & $ badly flashed over) - No.4 traction motor was replaced. Released from Doncaster Works. |
20 - | |
21 - | |
22 - | |
23 - | |
s24 - | |
25 - | |
26 - | |
27 - | |
28 - | |
29 - | |
30 - | 1A21 10:15 Newcastle - King's Cross. |
December
s1 - | |
2 - | |
3 - | |
4 - | |
5 - | |
6 - | |
7 - | |
s8 - | |
9 - | |
10 - | |
11 - | 1E15 17:00 Bradford - King's Cross, from Leeds. |
12 - | |
13 - | |
14 - | |
s15 - | |
16 - | |
17 - | |
18 - | |
19 - | |
20 - | |
21 - | |
s22 - | |
23 - | |
24 - | |
25 - | |
26 - | |
27 - | |
28 - | |
s29 - | |
30 - | 1A12 09:00 King's Cross - Newcastle. |
31 - |
D9011
(1962).....D9011 (1964)
1963.....HOME