9012 - 1972
January
| 1 - | 1S16 08:00 King's Cross - Edinburgh. |
| s2 - | King's Cross Loco. 'A' exam. 1Sxx King's Cross - Edinburgh. Haymarket TMD. 1E48 20:30 Aberdeen - King's Cross, "The Night Aberdonian" from Edinburgh to Doncaster (32 minute delay Doncaster - 9021 forward 03/01). Casualty report states Boiler defective - DME Doncaster states No.19 valve gland loose (water vapour in control cubicle causing CCB to trip). 21,860 miles since last classified repair (25.11.71). Conclusion: 21.01.72 DME KX states: The previous 'A' examination had taken place on 02.01.72 at King's Cross and suitable notice is being taken with the fitter concerned. |
| 3 - | Doncaster TMD. 'A' exam & repairs - Condition of loco following Classified repair report states: boiler gland repacked. |
| 4 - | 1A16 09:48 Harrogate - King's Cross, "The Yorkshire Pullman". 1L22 15:55 King's Cross - Harrogate. |
| 5 - | 1A14 09:25 Leeds - King's Cross. 1L22 15:55 King's Cross - Harrogate (32 minute delay King's Cross - 9005 forward). Casualty report states: ETH defect - conduit at No.1 end buffer beam broken damaging ETH control loop circuit wire. 23,130 miles since last classified repair (25.11.71) - 32,130 stated. Conclusion 21.01.72 DME KX states: The conduit concerned is behind the buffer beam and had apparently been struck by some external object. Finsbury Park TMD. |
| 6 - | Finsbury Park TMD. Repairs - Condition of loco following Classified repair report states: No.1 end struck stray object. 1L34 17:30 King’s Cross - Bradford. |
| 7 - | 1A03 07:25 Leeds - King's Cross. 1L33 17:05 King's Cross - Harrogate, "The Yorkshire Pullman". |
| 8 - | 1A16 09:48 Harrogate - King's Cross, "The Yorkshire Pullman". 1L33 17:05 King's Cross - Harrogate, "The Yorkshire Pullman". |
| s9 - | |
| 10 - | Holbeck TMD. 'A' exam. |
| 11 - | King's Cross Loco. 1S42 16:00 King's Cross - Edinburgh, to Peterborough (7 minute delay Hatfield and 18 minutes at Peterborough - 1503 forward). Casualty report states: ETH defective - driver uncoupled locomotive from train at Hatfield and could not fault locomotive. Driver Harrison (King's Cross) reports: ETH was perfect on shed and was no trouble until Wood Green, when it shut down, repeated attempts to start it failed. There was a speed restriction at Hatfield (20 mph) so I decided to stop the engine in the platform and inform control. Whilst I went to phone I told my secondman to uncouple the leads and try the engine on its own and it worked well. I had a fresh engine at Peterborough and had no further trouble. 25,840 miles since last classified repair (25.11.71). Conclusion: 08.02.72 DME KX states: I can only assume that this was due to earth fault leakage on the coaching stock causing operation of the power earth fault relay on the locomotive. Peterborough TMD. 1S60 19:55 King's Cross - Aberdeen, from Peterborough to Newcastle (ex 9015). |
| 12 - | Gateshead TMD. 1A22 10:55 Newcastle - King's Cross. Condition of loco following Classified repair report states: Flashover on main generator (failed King's Cross) Inspector Edwards report this date: No.1 engine breathing heavy. |
| 13 - | Finsbury Park TMD. Casualty report dated 20.01.72 states loco off 'C' exam. |
| 14 - | Condition of loco following
Classified repair report states: Booked riding rough (failed King's
Cross). 1L22 15:55 King's Cross - Harrogate. |
| 15 - | 1A16 09:48 Harrogate - King's Cross, "The Yorkshire Pullman". |
| s16 - | |
| 17 - | |
| 18 - | Heaton CS. 'A' exam. |
| 19 - | 1E01 08:00 Edinburgh - King's Cross. (1S42 16:00 King's Cross - Edinburgh). Haymarket TMD. 1E48 20:30 Aberdeen - King's Cross, "The Night Aberdonian" (28 minute delay Edinburgh - nothing stated as going forward but Chronicles has 1E01 on the morning of 20/01). Casualty report states: Boiler defective - CM&EE Glasgow states 30 amp fuse blown on burner motor. 28,360 miles since last classified repair (25.11.71). Conclusion: 17.02.72 DME KX states: I am unable to understand why the enginemen could not have renewed this fuse without incurring 28 minutes delay. Unless the Depot Manager Haymarket can give any further information to the contrary I am treating this casualty as non-mechanical. |
| 20 - | Haymarket TMD. Repairs - 30 amp fuse replaced on boiler burner motor. 1E01 08:00 Edinburgh - King's Cross. |
| 21 - | 1A11 08:10 Newcastle - King's Cross. 1N27 18:00 King's Cross - Newcastle. Gateshead TMD. |
| 22 - | Gateshead TMD. 1A11 08:10 Newcastle -King's Cross. 1S42 16:00 King's Cross - Edinburgh, to Peterborough. Casualty report states: ETH defect. Peterborough TMD. 1L34 17:30 King’s Cross - Bradford, from Peterborough (89 late at Newark). |
| s23 - | 1A08 09:20 Leeds - King's Cross (via Knottingley). |
| 24 - | Finsbury Park TMD. Shopping proposal dated 25.01.72 states loco off 'B' exam. |
| 25 - | Finsbury Park TMD. Condition of loco following Classified repair report states: Brake fault both ends. Locomotive proposed for No.1 engine change. Shopping proposal states: No.1 engine breathing steam (suspect liner seal) - loco in normal service. 30,900 miles since last classified repair (25.11.71). 28.01.72 No.1 engine examined by BRB representative M. Baker considered loco fit to remain in service. 1S16 08:00 King's Cross - Edinburgh. |
| 26 - | Finsbury Park TMD. Repairs - No.1 end ETH conduit fractured at entrance to junction box (as 05.01.72. |
| 27 - | 1A04 07:15 Bradford - King's Cross. 1A31 16:22 Harrogate - King's Cross. |
| 28 - | 1A04 07:15 Bradford - King's Cross. 1L13 11:30 King's Cross - Harrogate, to Leeds. Holbeck TMD. 'A' exam. |
| 29 - | 1A22 10:55 Newcastle - King's Cross. 1Sxx King's Cross - Edinburgh. Haymarket TMD. 1E42 19:10 Aberdeen - King's Cross, from Edinburgh (14 minute delay Peterborough & 28 minutes at Holme). Casualty report states: Short of boiler water at Peterborough & fire bells ringing at Holme. |
| s30 - | King's Cross Loco. 1S35 14:00 King's Cross - Edinburgh, to Newcastle (9 minute delay Newcastle - 9004 forward). Casualty report states: ETH defective - DME Newcastle could not fault. 33,430 miles since last classified repair (25.11.71). Conclusion: 31.01.72 DME KX states: As no fault was found with the locomotive I can only assume that the defect was on the coaching stock, particularly as this was during snowy weather. Gateshead TMD. Repairs - no fault found. |
| 31 - | 1A31 16:22 Harrogate - King's Cross. |
February
| 1 - | |
| 2 - | |
| 3 - | Finsbury Park TMD. Condition of loco following Classified repair report states: No.1 bogie L&R hand trailing shock absorber bolts broken & No.2 main generator brushes renewed. |
| 4 - | Finsbury Park TMD. Casualty report dated 07.02.72 states loco off 'C' exam. |
| 5 - | |
| s6 - | |
| 7 - | (1A07 07:35 Newcastle - King's Cross). King's Cross Loco. 'A' exam. 1S35 14:00 King's Cross - Edinburgh (10 minute delay Doncaster). Casualty report states: ETH tripping out with resultant loss of power - after closing controller power was regained and ETH re-established by depressing 'Heat On' button. 36,800 miles since last classified repair (25.11.71). Conclusions: 06.03.72 DME KX states: I can only assume that the difficulty experienced was due to an earth fault on the coaching stock as no further trouble has been experienced with this locomotive. Haymarket TMD. 1E42 19:10 Aberdeen - King's Cross, from Edinburgh to Newcastle (1970 forward 08/02). Casualty report states: Boiler out of order - low water Mobrey float switch Niphon plug loose. 37,820 miles since last classified repair (25.11.71). Conclusion: 08.02.70 DME KX states: It is accepted that this casualty was due to carelessness on the part of the electrician responsible at the previous 'C' examination and suitable notice has been given. |
| 8 - | Gateshead TMD. Repairs - Niphon plug inserted fully & lock ring tightened. |
| 9 - | 1A11 08:10 Newcastle - King's Cross. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
| 10 - | |
| 11 - | |
| 12 - | 1N10 11:00 King's Cross - Newcastle. |
| s13 - | 1N29 18:00 King's Cross - Newcastle. |
| 14 - | 1N27 18:00 King's Cross - Newcastle. Gateshead TMD. 'A' exam. |
| 15 - | Gateshead TMD. 0A07 Gateshead - Heaton. 5A07 Heaton - Newcastle (20 minute delay at Heaton CS). Casualty report states: Heater pipe lug damaged - probably due to heater pipe not being secured on chain (heater pipe renewed by C&W staff). 41,270 miles since last classified repair (25.11.71). Conclusion 16.02.72 DME KX states: The buffer beam hoses on this class of locomotive tend to hang lower than on others and are therefore more prone to damage if due to mismanagement by shunting staff they are left swinging free. 1A07 07:35 Newcastle - King's Cross. Finsbury Park TMD. Condition of loco following Classified repair report states: both cabs require draught-proofing (persistent complaints) & No.2 engine fan clutch slipping badly. |
| 16 - | |
| 17 - | |
| 18 - | Finsbury Park TMD. Casualty report dated 27.02.72 states loco off 'C' exam. |
| 19 - | Condition of loco following Classified repair report states: Broken brake hanger No.1 end. |
| s20 - | |
| 21 - | 1S35 14:00 King's Cross - Edinburgh. |
| 22 - | 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
| 23 - | |
| 24 - | |
| 25 - | 1A31 16:22 Harrogate - King's Cross. 1S77 23:10 King's Cross - Edinburgh, "The Night Capitals". |
| 26 - | Haymarket TMD. 'A' exam. 1E11 12:00 Edinburgh - King's Cross. |
| s27 - | 1E25 16:00 Edinburgh - King's Cross,
to Doncaster (9 minute delay Doncaster - 1107 forward). Casualty report states: No.2 engine cutting out - locomotive for works attention. 47,500 miles since last classified repair (25.11.71). Doncaster TMD. |
| 28 - | Doncaster TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.2 engine dephased. |
| 29 - | To Doncaster Works - Unclassified repair. No.2 power unit 450 dephased - 450 was given an Intermediate repair and refitted. |
March
| 1 - | Doncaster Works. |
| 2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| s5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Released from Doncaster Works. |
| 8 - | Finsbury Park TMD. 'D' exam & boiler J2944 on test - satisfactory for service. |
| 9 - | Finsbury Park TMD. Casualty report dated 26.04.72 states loco off 'D' exam. |
| 10 - | Finsbury Park TMD. 0S26 Finsbury Park - King's Cross (mis-wound 3rd character). 1S16 08:00 King's Cross - Edinburgh. |
| 11 - | 1A27 13:15 Newcastle - King’s Cross. |
| s12 - | |
| 13 - | |
| 14 - | 1N27 18:00 King's Cross - Newcastle. Gateshead TMD. |
| 15 - | Gateshead TMD. 1A07 07:35 Newcastle - King's Cross. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
| 16 - | |
| 17 - | 1S60 19:55 King's Cross - Aberdeen. |
| 18 - | 1A30 15:20 Newcastle - King's Cross. |
| s19 - | |
| 20 - | 1E17 10:30 Aberdeen - King's Cross, from Edinburgh. |
| 21 - | |
| 22 - | 1N10 11:00 King's Cross - Newcastle. |
| 23 - | Neville Hill TMD. 'A' exam. |
| 24 - | 1A15 09:05 Newcastle - King's Cross, "The Tees-Tyne Pullman"
to York (7 minute delay Northallerton & 6 minutes at York - 1111
forward). Casualty report states: Loss of coolant on No.2 engine (suspect cylinder liner defective). 58,730 miles since last classified repair (25.11.71). York TMD. Locomotive taken out of traffic - awaiting works attention. To Doncaster Works - Unclassified repair. No shopping proposal - No.2 power unit 450 replaced by 428. |
| 25 - | Doncaster Works. |
| s26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| 28 - | Released from Doncaster Works. |
| 29 - | Finsbury Park TMD. Shopping proposal dated 20.04.72 states loco off 'B' exam. |
| 30 - | |
| 31 - |
April
| 1 - | |
| s2 - | |
| 3 - | |
| 4 - | |
| 5 - | 1L03 07:55 King's Cross - Bradford. 1A21 11:50 Bradford - King's Cross. 1S66 20:20 King's Cross - Edinburgh. |
| 6 - | 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". Gateshead TMD. |
| 7 - | Gateshead TMD. 1A27 13:15 Newcastle - King's Cross. 1S66 20:20 King's Cross - Edinburgh. |
| 8 - | Haymarket TMD. 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". 1L37 19:00 King's Cross - Bradford. |
| s9 - | 1L33 17:15 King's Cross - Leeds. |
| 10 - | 1A03 07:25 Leeds - King's Cross. |
| 11 - | Finsbury Park TMD. Repairs. |
| 12 - | Finsbury Park TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.1 engine sparge jet oil filter thread in BC crankcase oil gallery stripped out (crankcase thread to 'Heli-Coil', also High Water Switch (185°) switch required complete with collets - defective one removed (loco to works on No.2 engine only). 67,000 miles since last classified repair (25.11.71). 0D01 Finsbury Park - Doncaster (noted Grantham 18:58). |
| 13 - | To Doncaster Works - Unclassified repair. No.1 power unit 404 sparge jet oil filter in 'BC' crankcase oil gallery stripped out - 'BC' sparge jet oil filter thread was repaired and a replacement high water temperature gauge was fitted. Released from Doncaster Works. |
| 14 - | 1L03 07:55 King's Cross - Leeds. 1A21 11:50 Bradford - King's Cross. Finsbury Park TMD. |
| 15 - | Finsbury Park TMD. |
| s16 - | |
| 17 - | National 'Work To Rule' Deltic Services: 1A03/1L03/1S16/1S17/1A15/1A16 cancelled. |
| 18 - | National 'Work To Rule' emergency
timetable: 1A04/1N06/1L03/1A07/1A16/1L13/1A21 cancelled. 1A08 08:31 Leeds - King's Cross (46 late at Newark). (1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman"). 5N25 Newcastle - Heaton (stock off 1N25 17:00 KX-N'cle). Gateshead TMD. |
| 19 - | National 'Work To Rule' emergency
timetable: 1A04/1N06/1L03/1A07/1A16/1L13/1A21 cancelled. Gateshead TMD. 'A' exam. 5A06 05:55 Heaton -Darlington. 1A06 07:05 Darlington - King's Cross. |
| 20 - | National 'Work To Rule' emergency
timetable: 1A04/1N06/1L03/1A07/1A16/1L13/1A21 cancelled. 1L06 09:10 King's Cross - Leeds, to Peterborough (16 minute delay Peterborough - 1506 forward). Casualty report states: Locomotive very low in power - No.1 engine 'B' bank pump cambox drive defective & fuel rack to governor settings for both engines incorrect (loco for works attention). Report also states 'A' exam at King's Cross prior to 2B39, though no date given or details of 2B39. 70,800 miles since last classified repair (25.11.71). Conclusions: 26.05.72 DME KX states: The English Electric Diesels representative, Mr Baker, was riding on the locomotive at the time of failure to investigate a report of low in power and engines hunting on full load. Peterborough TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.1 engine B bank fuel pumps camshaft adrift. |
| 21 - | National 'Work To Rule' emergency
timetable: 1A04/1N06/1L03/1A07/1A16/1L13/1A21 cancelled. Peterborough TMD. 0D01 Peterborough - Doncaster (towing 5673 - noted Newark 08:08). To Doncaster Works - Unclassified repair. No.1 power unit 404 'B' bank fuel pump camshaft adrift - 404 was repaired, No.2 power unit 428 was load tested. |
| 22 - | Doncaster Works. |
| s23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| 25 - | Released from Doncaster Works. 1A35 18:20 York - King's Cross. |
| 26 - | 1L22 15:55 King's Cross - Harrogate. |
| 27 - | |
| 28 - | 1A27 13:15 Newcastle - King's Cross. |
| 29 - | |
| s30 - |
May
| 1 - | New timetable period |
| 2 - | |
| 3 - | 1A15 09:05 Newcastle - King's Cross, "The Tees-Tyne Pullman". |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | 1A16 10:10 Bradford - King's Cross. |
| 8 - | 1A04 07:15 Bradford - King's Cross. 1L13 11:30 King’s Cross - Harrogate. |
| 9 - | |
| 10 - | Finsbury Park TMD. Casualty report dated 12.05.72 states loco off 'B' exam. 1N29 19:00 King's Cross - Newcastle. Gateshead TMD. 'A' exam. |
| 11 - | King's Cross Loco. 'A' exam. |
| 12 - | National 'Work To Rule' Deltic Services:
1A04/1N06/1L03/1A07 cancelled. 1S42 16:00 King's Cross - Edinburgh, "The Talisman" to Newcastle (15 minute delay Newcastle - 1936 forward). Casualty report states: No.1 engine shut down - low coolant for no apparent reason. 79,660 miles since last classified repair (25.11.71). Conclusions: 09.06.72 DME KX states: Please see subsequent casualty to this locomotive on 13.05.72 after which it was found that the engine had a liner seal leaking. It is a pity that more thorough investigation had not taken place after this first casualty, so that the second might have been avoided. It is, however, noted that these incidents occurred during a period of national industrial dispute. Gateshead TMD. Repairs - Lubricating oil water content 0.1%, but lubricating oil viscosity high. Coolant header tank topped up and No.1 engine lub oil changed. Loco to traffic on Regional Control instructions. |
| 13 - | Gateshead TMD. 1A22 11:00 Newcastle - King's Cross, to York (39 minute delay Eryholme 6755 assist to York - 1509 forward). Casualty report states: No.1 engine shut down due to low coolant - cylinder liner seal leaking, confirmed by EE Diesels representative (loco for works attention). 80,595 miles since last classified repair (25.11.71). Conclusions: 15.06.72 DME KX states: see conclusions to casualty on 12.05.72. York TMD. |
| s14 - |
No trains due to industrial action. |
| 15 - | York TMD. Locomotive taken out of traffic - awaiting works attention. To Doncaster Works - Unclassified repair. No.1 power unit 404 liner seal leaking - 404 replaced by 416. |
| 16 - | Doncaster Works. |
| 17 - | Released from Doncaster Works. |
| 18 - | (1S60 19:55 King's Cross - Aberdeen, to Edinburgh). |
| 19 - | Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross (rear headcode: 1S60). 1L33 17:05 King's Cross - Harrogate, "The Yorkshire Pullman". 1A41 21:25 Bradford - King's Cross. |
| 20 - | 1L05 08:25 King's Cross - Leeds. 1A26 13:35 Leeds - King's Cross. |
| s21 - | |
| 22 - | 1N29 19:00 King's Cross - Newcastle. |
| 23 - | Reduced Timetable due to industrial action
at King's Cross. Doncaster TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: Collision damage. To Doncaster Works - Unclassified repair. Collision damage: No.2 nose end dented above heater cock, paintwork cracked and chipped, No.2 bogie 9000-12 main reservoir pipe flattened, vacuum train pipe damaged, auto-air brake pipe fractured and screw coupling guard bent - all damage was repaired and both bogies had bolster segments repaired. |
| 24 - | Doncaster Works. |
| 25 - | Doncaster Works. |
| 26 - | Released from Doncaster Works. |
| 27 - | 1A16 09:48 Harrogate - King's Cross, "The Yorkshire Pullman". 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| s28 - | 1S42 16:00 King's Cross - Edinburgh. Haymarket TMD. |
| 29 - | |
| 30 - | 1A07 07:32 Newcastle - King's Cross. 1S35 14:00 King's Cross - Edinburgh (via Carlisle due to derailment at Chathill). |
| 31 - |
June
| 1 - | |
| 2 - | 1L34 17:30 King's Cross - Bradford. |
| 3 - | 1S35 14:00 King's Cross - Edinburgh. |
| s4 - | 1S35 14:00 King's Cross - Edinburgh. P.Ref |
| 5 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 6 - | |
| 7 - | 1N10 11:00 King's Cross - Newcastle. 1A32 17:00 Newcastle - King's Cross. |
| 8 - | 5B41 16:50 Bounds Green - King's Cross (forms 1B41 17:40
KX-Huntingdon). 1N27 18:00 King's Cross - Newcastle. |
| 9 - | |
| 10 - | |
| s11 - | |
| 12 - | |
| 13 - | |
| 14 - | Finsbury Park TMD. Casualty report dated 21.06.72 states: loco off 'C' exam. 1S77 23:15 King's Cross - Edinburgh, "The Night Capitals". |
| 15 - | Haymarket TMD. 1E11 12:00 Edinburgh - King’s Cross. |
| 16 - | |
| 17 - | 1N08 09:00 King's Cross - Newcastle. |
| s18 - | |
| 19 - | 1E01 08:00 Edinburgh - King's Cross. King's Cross Loco. 'A exam. |
| 20 - | 1A03 07:25 Leeds - King's Cross (14 minute delay
Peterborough). Casualty report states: loss of power with both engines - driver shut down No.1 engine and proceeded on No.2 engine only (two pairs of load regulator tips No.1 load regulator badly burnt. 97,380 miles since last classified repair (25.11.71). Conclusion: 04.07.72 DME KX states: The examination of the load regulator tips was carried out by an new entrant electrician. Finsbury Park TMD. Repairs - load regulator tips renewed. 1L22 15:55 King's Cross - Harrogate, to Leeds. |
| 21 - | 1N08 09:00 King's Cross - Newcastle. |
| 22 - | 1N06 07:45 King's Cross - Newcastle. (1A27 14:15 Newcastle - King's Cross). King's Cross Loco. 'A' exam. 1N42 23:55 King's Cross - Newcastle (31 minute delay at Northallerton - 5587 assist to Darlington, 6703 assist forward 23/06). Casualty reports states: Loss of power - No.1 engine underspeed governor drive broken (Metallastik coupling sheared). 98,860 miles since last classified repair (25.11.72). Conclusions: 28.06.72 DME KX states: This item does not give satisfactory service and some investigation into the design is recommended. |
| 23 - | Gateshead TMD. 'B' exam & repairs - No.1 engine underspeed governor coupling renewed. |
| 24 - | 1A27 14:15 Newcastle - King’s Cross. |
| s25 - | |
| 26 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". |
| 27 - | 0B01. 1L22 15:55 King's Cross - Harrogate. |
| 28 - | Holbeck TMD. 'A' exam. |
| 29 - | 1E01 08:00 Edinburgh - King's Cross. King's Cross Loco. 'A' exam. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman" (55 minute delay Tollerton - unknown what went forward). Casualty report states: No.1 engine cut out and No.1 bogie on fire - DME Leeds states No.1 main generator on fire (not a normal flashover and suspected short circuit had occurred in the armature), armature and commutator badly damaged. Locomotive to works for attention. 120,500 miles since last classified repair (25.11.72). Conclusions: 19.07.72 DME KX states: I am advised by DME Leeds that the main generator caused the bogie fire due to flame passing through the air vent under the generator and affecting the under-structure, as a result of the underframe being dirty due to oil contamination. Such a serious failure of a main generator is unusual and no doubt the CM&EE will follow up with BREL regarding results of inspection on strip down. York TMD. Locomotive taken out of traffic - awaiting works attention. |
| 30 - | To Doncaster Works - Unclassified repair. No.1 main generator fire damage - No.1 power unit 416 replaced by 406, damaged traction motor cables were repaired, No.1 bogie 9000-11 had No.3 traction motor replaced and brake gear repaired, No.2 bogie 9000-12 also had brake gear repaired. |
July
| 1 - | Doncaster Works. |
| s2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| 5 - | Released from Doncaster Works. Doncaster TMD. Tyre turning. |
| 6 - | |
| 7 - | 1S16 08:00 King’s Cross - Edinburgh. Haymarket TMD. 1E35 20:20 Edinburgh - King's Cross. |
| 8 - | 1S17 10:00 King’s Cross - Edinburgh, "The Flying Scotsman". |
| s9 - | |
| 10 - | |
| 11 - | |
| 12 - | Finsbury Park TMD. Boiler J2944 on test - no repairs required. |
| 13 - | |
| 14 - | Finsbury Park TMD. Shopping proposal dated 10.08.72 states loco off 'D' exam. |
| 15 - | 1A16 09:48 Harrogate - King’s Cross, "The Yorkshire Pullman". 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| s16 - | |
| 17 - | |
| 18 - | (1E01 08:00 Edinburgh - King's Cross). 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman" (rear TRN: 1E01). |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | ECML flooded at Dunbar - services via
Carlisle. 1S19 11:00 King's Cross - Edinburgh. |
| s23 - | ECML flooded at Dunbar - services via Carlisle. |
| 24 - | ECML flooded at Dunbar - services via Carlisle. |
| 25 - | |
| 26 - | 1A27 14:15 Newcastle - King’s Cross. |
| 27 - | 1A16 09:48 Harrogate - King’s Cross, "The Yorkshire Pullman". 1L22 15:55 King's Cross - Harrogate. |
| 28 - | 1A16 09:48 Harrogate - King’s Cross, "The Yorkshire Pullman". |
| 29 - | 1A16 09:48 Harrogate - King’s Cross, "The Yorkshire Pullman". 1L34 17:30 King’s Cross - Bradford. |
| s30 - | 1S32 12:00 King’s Cross - Aberdeen, to Edinburgh. |
| 31 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". Haymarket TMD. |
August
| 1 - | Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross. |
| 2 - | 1A03 07:25 Leeds - King's Cross. |
| 3 - | |
| 4 - | 1A04 07:15 Bradford - King's Cross. 1L13 11:30 King’s Cross - Harrogate. |
| 5 - | 1A16 09:48 Harrogate - King’s Cross, "The Yorkshire Pullman". |
| s6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | Finsbury Park TMD. Locomotive proposed for Classified repair. 125,000 miles since last classified repair 25.11.72). |
| 11 - | Finsbury Park TMD. Shopping proposal dated 22.08.72 states loco off 'B' exam. 1N27 18:00 King's Cross - Newcastle. Gateshead TMD. |
| 12 - | Gateshead TMD. 1A11 08:15 Newcastle - King's Cross. 1L33 16:05 King's Cross - Harrogate, "The Yorkshire Pullman". |
| s13 - | |
| 14 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". Haymarket TMD. |
| 15 - | Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross. |
| 16 - | |
| 17 - | |
| 18 - | 1E11 12:00 Edinburgh - King’s Cross. |
| 19 - | King's Cross Loco. 'A' exam. |
| s20 - |
Haymarket TMD. 1E17 10:00 Aberdeen - King's Cross, from Edinburgh to Darlington (135 minute delay Darlington - 1798 forward). Casualty report states: CCB tripping - complete loss of power. 128,000 miles since last classified repair (25.11.72). Gateshead TMD. Repairs - Indicator flag on blower motor 3 relay was found to be touching terminal - this was found to have been caused by incorrect assembly of the flag (it was mounted upside down). Flag correctly assembled and loco taken on a test run which proved satisfactory. |
| 21 - | Gateshead TMD. 1A27 14:15 Newcastle - King's Cross. PIC |
| 22 - | Finsbury Park TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.1 engine defective (cylinder liner cracked) & No.1 engine fan clutch shoes to renew - loco to works on No.2 engine only. 135,000 miles since last classified repair (25.11.72). |
| 23 - | Finsbury Park TMD. awaiting works attention. |
| 24 - | Finsbury Park TMD. awaiting works attention. 5L30 10:50 Holloway - Holgate (ECS - noted running 58 early at Newark). To Doncaster Works - Unclassified repair. No.1 power unit 406 cracked cylinder liner - 406 replaced by 414. |
| 25 - | Doncaster Works. |
| 26 - | Released from Doncaster Works. |
| s27 - | |
| 28 - | |
| 29 - | 1N27 18:00 King's Cross - Newcastle. |
| 30 - | 1S42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 31 - |
September
October
| s1 - | |
| 2 - | 1A14 09:25 Leeds - King's Cross. Finsbury Park TMD. |
| 3 - | 1S17 10:00 King’s Cross - Edinburgh, "The Flying Scotsman". Haymarket TMD. 1E40 22:30 Edinburgh - King's Cross, "The Night Capitals" to Doncaster (1770 forward 04/10). casualty report states: Boiler not working - feed water check valve defective. 148,460 miles since last classified repair (25.11.72). |
| 4 - | Doncaster TMD. Repairs - new feed water check valve obtained from BREL and fitted, boiler cycle tested. |
| 5 - | 1A11 08:10 Newcastle - King's Cross. |
| 6 - | 1A07 07:32 Newcastle - King's Cross. |
| 7 - | 1N10 11:00 King's Cross - Newcastle. |
| s8 - | |
| 9 - | 1N06 07:45 King's Cross - Newcastle. 1A27 14:15 Newcastle - King’s Cross. 1S60 19:55 King's Cross - Aberdeen, to Newcastle. |
| 10 - | Gateshead TMD. 1A27 14:15 Newcastle - King’s Cross. |
| 11 - | 1A15 09:05 Newcastle - King's Cross, "The Tees-Tyne Pullman". 1S42 16:00 King's Cross - Edinburgh, "The Talisman". Haymarket TMD. |
| 12 - | Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross. 1L33 17:05 King's Cross - Harrogate, "The Yorkshire Pullman". |
| 13 - | |
| 14 - | 0B01. 1L05 08:25 King's Cross - Leeds. 1A26 13:35 Leeds - King's Cross. King's Cross Loco. 'A' exam - to traffic 21:45. 1S70 22:15 King's Cross - Aberdeen, "The Night Aberdonian" to Edinburgh (30 minute delay York 15/10). Casualty report states: short of boiler water - tank refilled and locomotive worked forward. 155,000 miles since last classified repair (25.11.72). |
| s15 - | Haymarket TMD. |
| 16 - | Haymarket TMD. 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". 1L37 19:05 King's Cross - Bradford. |
| 17 - | |
| 18 - | |
| 19 - | King's Cross Loco. 'A' exam. 1Lxx King's Cross - Leeds. |
| 20 - |
1A04 07:15 Bradford - King's Cross (24 minute delay Peterborough). casualty report states: No.1 engine shut down due to overspeed tripped and unable to reset. 156,500 miles since last classified repair (25.11.72). conclusions: 23.10.72 DME KX states: The engine concerned had been fitted in works some two months prior to this failure and the locomotive had not received a 'D' examination in the interim period. Finsbury Park TMD. Repairs - Isopeedic unit pawl freed and lightly lubricated and operation of mechanism checked. |
| 21 - | 1A11 08:15 Newcastle - King's Cross. |
| s22 - | |
| 23 - | 1S35 14:00 King's Cross - Edinburgh. |
| 24 - | 1N10 11:00 King's Cross - Newcastle. 1A32 17:00 Newcastle - King's Cross (noted Doncaster). 1A40 20:20 Newcastle - King's Cross (from) (Richard Scott second-man relief crew ex Doncaster 23:23). |
| 25 - | 1N08 09:00 King's Cross- Newcastle. |
| 26 - | 1E07 11:00 Edinburgh - King's Cross. |
| 27 - | |
| 28 - | Hexthorpe Bridge. Awaiting works. To Doncaster Works - Intermediate repair (proposed 20.08.72). No shopping proposal - power units No.1 414 replaced by 453 & No.2 428 replaced by 434, bogies No.1 9000-11 replaced by 9000-24 & No.2 9000-12 replaced by 9000-48 and boiler 1488/J2944 replaced by 1492/J2948. The body was given an Intermediate repair. |
| s29 - | Doncaster Works. |
| 30 - | Doncaster Works. |
| 31 - | Doncaster Works. |
November
| 1 - | Doncaster Works. |
| 2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| s5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| 9 - | Doncaster Works. |
| 10 - | Doncaster Works. |
| 11 - | Doncaster Works. |
| s12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| 14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| 16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| s19 - | Doncaster Works. |
| 20 - | Doncaster Works. |
| 21 - | Doncaster Works. |
| 22 - | Doncaster Works. |
| 23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| 25 - | Released from Doncaster Works. |
| s26 - | |
| 27 - | 1A29 16:28 Doncaster - King's Cross, to Peterborough (piloting 1778). 0D01 Peterborough - Doncaster (noted Newark 20:56). |
| 28 - | 1L22 15:55 King's Cross - Harrogate, to Leeds. 1L33 17:05 King's Cross - Harrogate, "The Yorkshire Pullman" from Leeds. |
| 29 - | Condition of loco following
Classified repair report states: Cab doors defective & cabs draughty. 1E43 23:30 Edinburgh - King's Cross, "The Night Scotsman". |
| 30 - | King's Cross Loco. |
December
| 1 - | 1N08 09:00 King's Cross - Newcastle. 1A32 17:00 Newcastle - King's Cross. |
| 2 - | 1E11 12:00 Edinburgh - King’s Cross. |
| s3 - | |
| 4 - | 1E11 12:00 Edinburgh - King’s Cross. |
| 5 - | 1E25 16:00 Edinburgh - King's Cross, "The Talisman". Finsbury Park TMD. Condition of loco following Classified repair report states: CCB tripping and flashover repairs. |
| 6 - | Finsbury Park TMD. Condition of loco following Classified repair report states: No.2 engine A5 injector renewed, No.1 main generator flashed over (both main generators very oily), No.2 end fuel tanks body bracket bolts loose, bad oil leak from No.1 engine overspeed unit (stud broken in cover), No.2 engine drum tank end cover blown out, No.1 engine coolant sample cock leaking & toilet outlet pipe uncoupled under buffer beam No.2 end. |
| 7 - | (Finsbury Park TMD). |
| 8 - | (Finsbury Park TMD). 1N06 07:45 King's Cross - Newcastle. Gateshead TMD. Condition of loco following Classified repair report states: Oil pipe to No.1 engine Dowty pump loose (25 gallons oil supplied). |
| 9 - | |
| s10 - | |
| 11 - | 1A04 07:15 Bradford - King's Cross. 1L13 11:30 King’s Cross - Harrogate. 1A31 16:22 Harrogate - King's Cross. |
| 12 - | 1A31 16:22 Harrogate - King's Cross. |
| 13 - | 1E11 12:00 Edinburgh - King’s Cross. 1S66 20:20 King’s Cross - Edinburgh. |
| 14 - | Condition of loco following
Classified repair report states: ETH defect. Haymarket TMD. 1E01 08:00 Edinburgh - King's Cross. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
| 15 - | 1A32 17:00 Newcastle - King's Cross. 1L39 22:50 King's Cross - Bradford. |
| 16 - | 1A20 11:10 Leeds - King's Cross. 1L34 17:30 King’s Cross - Bradford. |
| s17 - | |
| 18 - | 1L13 11:30 King’s Cross - Harrogate. |
| 19 - | 1S16 08:00 King’s Cross - Edinburgh. Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 20 - | 1S16 08:00 King’s Cross - Edinburgh. Haymarket TMD. 1E25 16:00 Edinburgh - King's Cross, "The Talisman". |
| 21 - | Gateshead TMD. Condition of loco following Classified repair report states: No.2 engine shut down and loss of power - unable to start engine from cab. 1A15 09:05 Newcastle - King's Cross, "The Tees-Tyne Pullman". |
| 22 - | |
| 23 - | Finsbury Park TMD. Casualty report dated 01.01.73 states loco off 'B' exam. |
| s24 - | |
| 25 - | No service. |
| 26 - | |
| 27 - | 1L03 07:55 King's Cross -Bradford, to Leeds. Holbeck TMD. 0A21 Holbeck - Leeds. 1A21 11:50 Bradford - King's Cross, from Leeds. |
| 28 - | 1N06 07:45 King's Cross - Newcastle. |
| 29 - | 1N06 07:45 King's Cross - Newcastle. 1A27 14:15 Newcastle - King's Cross. King's Cross Loco. 'A' exam. 1S66 20:20 King's Cross - Edinburgh (9 minute delay at York). Casualty reports states: Instrument panel lights out - three lamps blown (lamps renewed by fitter at station). 17,900 miles since last classified repair (25.11.72). Conclusions: 01.01.73 DME KX states: Whilst failure of these lamps is a common occurrence it is most unusual for them to result in a casualty in traffic and one is inclined to question the justification for the driver causing a delay in these circumstances. |
| 30 - | Haymarket TMD. |
| s31 - |