D9004 - 1966

D9004 (1965).....D9004 (1967)

January

Click for current timetable

1 -  
s2 - To Doncaster Works - General repair.
No shopping proposal - power units No.1 436 & No.2 429 were repaired and refitted, bogies No.1 9000-15
& No.2 9000-16 were repaired and refitted and boiler 5088/J3239 was repaired and refitted. The body was
given a General repair and the following modifications were carried out: Protection bars for EP valves;
Cab footstep stiffening plates; Oil resisting compound to sandbox filler ducts
.
3 - Doncaster Works.
4 - Doncaster Works.
5 - Doncaster Works.
6 - Doncaster Works.
7 - Doncaster Works.
8 - Doncaster Works.
Locomotive is credited as 1B15 18:25 Doncaster - King's Cross (official entry to Works may be incorrect).
s9 - Doncaster Works.
10 - Doncaster Works.
11 - Doncaster Works.
12 - Doncaster Works.
13 - Doncaster Works.
14 - Doncaster Works.
15 - Doncaster Works.
s16 - Doncaster Works.
17 - Doncaster Works.
18 - Doncaster Works.
19 - Doncaster Works.
20 - Doncaster Works.
21 - Doncaster Works.
22 - Doncaster Works.
s23 - Released from Doncaster Works.
24 -  
25 -  
26 -  
27 -  
28 -  
29 - To Doncaster Works - Unclassified repair.
No shopping proposal - No.2 power unit 429 replaced by 455.
s30 - Doncaster Works.
31 - Released from Doncaster Works.

February

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 -  
s6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
s13 -  
14 -  
15 -  
16 -  
17 -  
18 -  
19 -  
s20 - Bridge collapse Hatfield.
21 -  
22 -  
23 -  
24 -  
25 -  
26 -  
s27 -  
28 -  

March

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 -  
s6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
s13 -  
14 -  
15 -  
16 -  
17 -  
18 -  
19 - 0B01 (noted Newark).
s20 -  
21 - 1st EE maintenance contract expires - mileage recorded at 838,624.
22 -  
23 - 1E02 07:00 Bradford - King's Cross, "The West Riding" from Leeds.
1A46 16:00 King's Cross - Glasgow Queen St,
"The Talisman" to Edinburgh.
24 -  
25 -  
26 -  
s27 -  
28 - 1A51 16:00 Edinburgh - King's Cross, "The Talisman".
29 -  
30 -  
31 -  

April

Click for current timetable

1 -  
2 - 1E14 (16:00 Harrogate or 16:10 Bradford) - King's Cross, "The White Rose" to Leeds (D9014 forward).
(
2E67 16:50 Leeds Central - Doncaster).

1B15 18:25 Doncaster - King's Cross.
s3 -  
4 - To Doncaster Works - Light repair.
No shopping proposal - power units No.1 436 & No.2 455 were given Unclassified repairs, bogies No.1
9000-15 replaced by 9000-25 & No.2 9000-16 replaced by 9000-26 and boiler 5088/J3239 was given an
Unclassified repair. The body was given an Unclassified repair
.
5 - Doncaster Works.
6 - Doncaster Works.
7 - Released from Doncaster Works.
1B11 16:30 Doncaster - King's Cross.
8 -  
9 - 1A30 14:00 King's Cross - Edinburgh, "The Heart of Midlothian".
s10 - 1A32 14:00 King's Cross - Edinburgh.
Haymarket TMD.
11 -  
12 -  
13 -  
14 -  
15 -  
16 -  
s17 -  
18 - New timetable period.
19 -  
20 -  
21 -  
22 -  
23 -  
s24 -  
25 -  
26 - 1A23 08:00 Edinburgh - King's Cross, "The Talisman".
27 -  
28 -  
29 -  
30 -  

May

Click for current timetable

s1 -  
2 -  
3 -  
4 -  
5 -  
6 - To Doncaster Works - Unclassified repair.
No.s 1 & 6 axles fractured - these were rectified.
7 - Doncaster Works.
s8 - Doncaster Works.
9 - Doncaster Works.
10 - Released from Doncaster Works.
11 -  
12 -  
13 -  
14 - King's Cross Loco (09:30).
s15 -  
16 -  
17 -  
18 -  
19 - 1A38 14:00 King's Cross - Edinburgh, "The Heart of Midlothian".
20 - 1N13 11:25 King's Cross - Harrogate, "The White Rose".
1E14 16:00 Harrogate - King's Cross, "The White Rose".
21 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman" (Winged Thistle).
s22 -  
23 -  
24 -  
25 -  
26 -  
27 -  
28 - 1A33 10:05 Perth - Holloway, "Anglo-Scottish Car Carrier" to Edinburgh (D9008 forward).
s29 -  
30 -  
31 - 1E14 16:00 Harrogate - King's Cross, "The White Rose". P.Ref

June

Click for current timetable

1 -  
2 -  
3 - 1A46 16:00 King's Cross - Edinburgh, "The Talisman".
4 -  
s5 -  
6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
s12 - 1A73 23:20 Edinburgh - King's Cross, "The Night Scotsman".
13 -  
14 -  
15 -  
16 -  
17 -  
18 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman".
1A58 19:30 King's Cross -Aberdeen, "The Aberdonian" to Edinburgh.
s19 - Haymarket TMD.
1A73 23:20 Edinburgh - King's Cross
, "The Night Scotsman".
20 -  
21 -  
22 - 1xxx 17:15 ex Edinburgh (return excursion).
23 - To Doncaster Works - Unclassified repair.
No shopping proposal - boiler 5088/J3239 replaced by 1497/J2953.
24 - Doncaster Works.
25 - Released from Doncaster Works.
1N01 22:45 King's Cross - Bradford, to Leeds.
s26 - Holbeck TMD.
27 -  
28 -  
29 -  
30 -  

July

Click for current timetable

D9004 was recorded on a brake-down train, 1Z99 Gateshead Shed to Alnmouth Yard, in July 1966. No exact date recorded, however, it is reported as the only spare loco on 52A and took the brake-down crane to Alnmouth due to a derailment in the coal road.

1 -  
2 -  
s3 -  
4 -  
5 -  
6 -  
7 -  
8 -  
9 -  
s10 -  
11 -  
12 - 1A18 10:10 King's Cross - Edinburgh. 
13 -  
14 -  
15 -  
16 -  
s17 -  
18 -  
19 -  
20 - 1N10 10:20 King's Cross - Bradford.
21 - 1A72 22:30 King's Cross - Edinburgh.
22 -  
23 -  
s24 -  
25 -  
26 -  
27 -  
28 -  
29 -  
30 - 1A36 13:35 King's Cross - Edinburgh.
s31 -  

August

Click for current timetable

1 -  
2 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman".
3 -  
4 -  
5 -  
6 -  
s7 -  
8 - To Doncaster Works - Unclassified repair.
No.1 power unit 436 'AC' bank No.5 piston fractured - 436 replaced by 437.
9 - Doncaster Works.
10 - Doncaster Works.
11 - Released from Doncaster Works.
12 -  
13 - 1A13 07:40 Sunderland - King's Cross.
s14 -  
15 -  
16 -  
17 -  
18 - 1N06 09:25 King's Cross - Bradford, to Leeds.
1E15 17:10 Bradford - King's Cross, from Leeds.
19 - 1A38 14:00 King's Cross - Edinburgh, "The Heart of Midlothian".
20 -  
s21 -  
22 -  
23 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman".
24 -  
25 - 1A18 10:10 King's Cross - Edinburgh.
26 -  
27 - 1A47 14:00 Edinburgh - King's Cross, "The Heart of Midlothian".
s28 -  
29 -  
30 -  
31 -  

September

Click for current timetable

1 -  
2 - 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman".
Haymarket TMD.
1A71 22:30 Edinburgh - King's Cross.
3 - King's Cross Loco. P.Ref 
s4 -  
5 - New timetable period.
6 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman". P.Ref
7 - 1A23 08:00 Edinburgh - King's Cross, "The Talisman".
8 - To Doncaster Works - Unclassified repair.
No.1 power unit 437 liner seal leaking - 437 replaced by 449, bogies No.1 9000-25 replaced by 9000-35 &
No.2 9000-26 replaced by 9000-36
.
9 - Doncaster Works.
10 - Doncaster Works.
s11 - Doncaster Works.
12 - Doncaster Works.
13 - Released from Doncaster Works.
14 -  
15 -  
16 -  
17 -  
s18 - 1A37 11:00 Edinburgh - King's Cross.
19 -  
20 -  
21 - 1A10 09:00 King's Cross - Newcastle.
Gateshead TMD.
1A49 17:00 Newcastle - King's Cross.
22 -  
23 -  
24 -  
s25 -  
26 -  
27 -  
28 -  
29 -  
30 - To Doncaster Works - Unclassified repair.
Flashover damage - No.3 traction motor overload was adjusted and main generators were examined for
reported flashover damage but no repairs were needed
.
Released from Doncaster Works.

October

Click for current timetable

1 -  
s2 -  
3 - 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman".
4 -  
5 -  
6 -  
7 -  
8 -  
s9 -  
10 -  
11 -  
12 -  
13 -  
14 -  
15 -  
s16 -  
17 -  
18 -  
19 -  
20 - *3E09 19:12 Edinburgh - King's Cross (parcels).
*Also credited with 3E05 23:56 N'cle-KX.
21 -  
22 -  
s23 -  
24 -  
25 -  
26 -  
27 - 1A23 08:00 Edinburgh - King's Cross, "The Talisman".
28 -  
29 -  
s30 -  
31 -  

November

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 -  
s6 -  
7 -  
8 -  
9 -  
10 -  
11 - 1E15 17:10 Bradford - King's Cross, from Leeds.
12 -  
s13 -  
14 -  
15 -  
16 -  
17 - To Doncaster Works - General repair.
No shopping proposal - power units No.1 449 replaced by 443 & No.2 455 replaced by 410, bogies No.1
9000-35 replaced by 9000-3 & No.2 9000-36 replaced by 9000-4 and boiler 1497/J2953 was given an
Unclassified repair. The body was given a General repair
.
18 - Doncaster Works.
19 - Doncaster Works.
s20 - Doncaster Works.
21 - Doncaster Works.
22 - Doncaster Works.
23 - Doncaster Works.
24 - Doncaster Works.
25 - Doncaster Works.
26 - Doncaster Works.
s27 - Doncaster Works.
28 - Doncaster Works.
29 - Doncaster Works.
30 - Doncaster Works.

December

Click for current timetable

1 - Doncaster Works.
2 - Doncaster Works.
3 - Doncaster Works.
s4 - Doncaster Works.
5 - Doncaster Works.
6 - Doncaster Works.
7 - Doncaster Works.
8 - Released from Doncaster Works.
9 -  
10 - 1A49 17:25 Newcastle - King's Cross.
s11 -  
12 -  
13 -  
14 -  
15 - To Doncaster Works - Unclassified repair.
No.2 main generator flashed over and field coils burnt - No.1 main generator was cleaned, two insulators
and five arc horns were fitted, No.2 main generator commutator and insulators were cleaned and one arc
horn was fitted. Extensive flashover damage to both bogies was repaired
.
16 - Doncaster Works.
17 - Doncaster Works.
s18 - Doncaster Works.
19 - Doncaster Works.
20 - Released from Doncaster Works.
21 - To Doncaster Works - Unclassified repair.
No.1 traction motor blower mounting broken, trunking and fan severely damaged - No.1 traction motor
blower was replaced and repairs were carried out to blower ducting, which was cleaned of foreign matter
.
22 - Released from Doncaster Works.
23 -  
24 -  
s25 -  
26 -  
27 -  
28 -  
29 -  
30 -  
31 -  

D9004 (1965).....D9004 (1967)
HOME