D9003 - 1968
January
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | To Doncaster Works - General repair. No shopping proposal - power units No.1 404 replaced by 538 & No.2 409 replaced by 444, bogies No.1 9000-3 replaced by 9000-33 & No.2 9000-4 replaced by 9000-34 and boiler 1494/J2950 replaced by 5094/J3245. The body was given a General repair and blue livery with full yellow nose ends was applied. The locomotive was fitted for dual braking. |
| 10 - | Doncaster Works. |
| 11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| s14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| 16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| 19 - | Doncaster Works. |
| 20 - | Doncaster Works. |
| s21 - | Doncaster Works. |
| 22 - | Doncaster Works. |
| 23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| 25 - | Doncaster Works. |
| 26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| s28 - | Doncaster Works. |
| 29 - | Doncaster Works. |
| 30 - | Doncaster Works. |
| 31 - | Doncaster Works. |
February
| 1 - | Doncaster Works. |
| 2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| s4 - | Doncaster Works. |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| 9 - | Doncaster Works. |
| 10 - | Doncaster Works. |
| s11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| 14 - | Released from Doncaster Works. |
| 15 - | |
| 16 - | |
| 17 - | |
| s18 - | |
| 19 - | |
| 20 - | To Doncaster Works - Unclassified repair. No.1 end 'M8' valve blowing through when isolated and both main generators flashed over - all repairs were carried out. |
| 21 - | Doncaster Works. |
| 22 - | Released from Doncaster Works. |
| 23 - | |
| 24 - | |
| s25 - | |
| 26 - | To Doncaster Works - Unclassified repair. No.1 power unit 538 suspect piston seized, excessive swarf in oil strainer and main fuel adaptors at 'A5' injector and blanking adaptor badly damaged - 538 replaced by 415. |
| 27 - | Doncaster Works. |
| 28 - | Released from Doncaster Works. |
| 29 - |
March
| 1 - | |
| 2 - | |
| s3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| s10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| s17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | To Doncaster Works - Unclassified repair. All traction motors and both main generators flashed over - all damage was rectified. Released from Doncaster Works. |
| 23 - | |
| s24 - | 1A39 13:30 Edinburgh - King's Cross. |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | 1A37 14:00 Edinburgh - King’s Cross, "The Heart of Midlothian". |
| s31 - |
April
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | 1A36 14:00 King's Cross - Edinburgh, "The Heart of Midlothian". |
| s14 - | 1A52 18:05 King's Cross - Newcastle. |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| s21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | 1A21 11:00 Newcastle - King's Cross. |
| 27 - | |
| s28 - | |
| 29 - | |
| 30 - |
May
| 1 - | 1A20 11:00 King's Cross - Newcastle. |
| 2 - | |
| 3 - | |
| 4 - | 1N24 17:35 King's Cross - Harrogate, to Leeds "The Yorkshire Pullman". |
| s5 - | |
| 6 - | New timetable period (first to run 12 months consecutively) |
| 7 - | |
| 8 - | |
| 9 - | 1A36 14:00 King's Cross - Edinburgh, "The Heart of Midlothian". |
| 10 - | 1E53 07:30 Leeds - King's Cross. 1A36 14:00 King's Cross - Edinburgh, "The Heart of Midlothian". |
| 11 - | |
| s12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| s19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| s26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
June
| 1 - | |
| s2 - | |
| 3 - | |
| 4 - | To Doncaster Works - Unclassified repair. No.1 bogie 9000-33 No.1 axle suspect fracture - axle was examined and no fault found, a broken stud in No.1 swing link pin locking plate was repaired. Released from Doncaster Works. |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | 3xxx Edinburgh - Dundee (parcels - AM). |
| s9 - | Eastfield TMD. Tyre turning. |
| 10 - | Eastfield TMD. Tyre turning. |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| 15 - | 1A28 12:15 King's Cross - Newcastle. |
| s16 - | Transferred to
34G Finsbury Park (ex 64B Haymarket on loan). (Transfer moves actually occurred early May 1968 to coincide with the new timetable). |
| 17 - | |
| 18 - | 3Z29 King's Cross - Edinburgh (pigeon special). |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| s23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| s30 - |
July
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| s14 - | |
| 15 - | 1N96 18:25 King's Cross - Hull, to Doncaster. |
| 16 - | To Doncaster Works - Light repair. Shopping proposal dated 09.07.68 by Finsbury Park - power units No.1 415 replaced by 424 & No.2 444 was given an Unclassified repair, bogies No.1 9000-33 replaced by 9000-43 & No.2 9000-34 replaced by 9000-44 and boiler 5094/J3245 was given an Unclassified repair. The body was given an Unclassified repair. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| 19 - | Released from Doncaster Works. |
| 20 - | |
| s21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| 27 - | |
| s28 - | |
| 29 - | |
| 30 - | |
| 31 - |
August
| 1 - | |
| 2 - | |
| 3 - | 1A23 10:00 Edinburgh - King's Cross, "The Flying Scotsman". |
| s4 - | |
| 5 - | 1A13 09:15 Newcastle - King's Cross, "The Tees-Tyne Pullman". |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| s11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| s18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | 1E89 21:24 Bradford - King's Cross. |
| s25 - | 1E89 21:35 Bradford - King's Cross. |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | 1A31 12:00 Edinburgh - King's Cross. |
| 31 - |
| s1 - | |
| 2 - | |
| 3 - | 1A26 12:00 King's Cross - Aberdeen, to Edinburgh. |
| 4 - | |
| 5 - | |
| 6 - | 1A31 12:00 Edinburgh - King's Cross. |
| 7 - | |
| s8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| s15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| s22 - | 1A37 11:00 Edinburgh - King's Cross. |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | 1A37 10:30 Aberdeen - King’s Cross, from Edinburgh. |
| s29 - | |
| 30 - |
October
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | Finsbury Park TMD. 0N24 Finsbury Park - King's Cross. 1N24 17:35 King's Cross - Harrogate. |
| s6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | 1A31 12:00 Edinburgh - King's Cross. |
| s13 - | |
| 14 - | 1A06 07:55 King's Cross - Newcastle. |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | 1A36 14:00 King's Cross - Edinburgh. |
| s20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| s27 - | |
| 28 - | 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| 29 - | |
| 30 - | |
| 31 - | Finsbury Park TMD. Boiler test - satisfactory for service. |
November
| 1 - | (Finsbury Park TMD). |
| 2 - | Finsbury Park TMD. Shopping proposal dated 27.12.68 states: loco off 1500-1800hrs exam. |
| s3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | 1A37 10:30 Aberdeen -King's Cross, from Edinburgh. |
| s10 - | |
| 11 - | Finsbury Park TMD. Boiler test - satisfactory for service. |
| 12 - | |
| 13 - | |
| 14 - | 1A33 15:15 Newcastle - King's Cross. |
| 15 - | |
| 16 - | |
| s17 - | 1A22 11:00 King's Cross - Newcastle. |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| s24 - | 1N16 13:20 King's Cross - Bradford. |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | 1A05 07:50 Newcastle - King's Cross. 1A50 18:15 King's Cross - Newcastle. Gateshead TMD. |
December
| s1 - | Gateshead TMD. |
| 2 - | |
| 3 - | |
| 4 - | Casualty report card states: Difficulty in
starting train - overloads operating due to over application of power. 64,200 miles since last classified repair (19.07.68). |
| 5 - | |
| 6 - | |
| 7 - | |
| s8 - | Finsbury Park TMD. Shopping proposal dated 27.12.68 states: loco off 500-600hrs exam. |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| s15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| s22 - | |
| 23 - | |
| 24 - | 1A17 08:00 Edinburgh - King's Cross. |
| 25 - | |
| 26 - | |
| 27 - | Finsbury Park TMD. Locomotive taken out of traffic - awaiting works attention. Shopping proposal states: No.2 main generator down to earth - to works on No.1 engine. 94,000 miles since last classified repair (19.07.68). |
| 28 - | |
| s29 - | |
| 30 - | To Doncaster Works - Unclassified repair. No.2 power unit 444 main generator down to earth and all traction motors to be checked for flashover damage - 444 replaced by 449, No.1 main generator had flashover damage repaired, all other work carried out. |
| 31 - | Released from Doncaster Works. |
D9003
(1967).....D9003 (1969)
1968.....HOME