_________________ Major Component Files _________________

 

_________ Preserved Power Unit Final Component Summary _________

 

 

Power units still extant following preservation and their individual components, with life expectancy circa 1981 (list complied by Carl Looker):
 

"This report has been produced to show the status, as at the end of BR Class 55 operation on 2 January 1982, of the individual components of the 17 D18-25 power units which entered preservation . Information has been taken from the BR component record cards which are held in the archives of the National Railway Museum in York. Due to the frequent interchange of components between power units, taking a reading from the Engine Hour Recorder on the triangle does not always give a complete picture of the power unit as a whole.
After general repairs the triangles were expected to run for 7,500 hours before the next general repair was due, main generators were expected to run to 10,000 hours between general repairs. Up to late 1979, phasing cases and scavenge blowers were also expected to run to 10,000 hours after overhaul, but this proved to be over optimistic, there were only 2 instances of blowers running to over 9,000 hours (with one exception, see below) and life expectancy was reduced to 5,000 hours after overhaul for cases and blowers. Some of the phasing cases in later years were given 'light attention' and had their life expectancies increased by 5,000 hours after this, it is not known what extent of work constituted 'light attention' but it can be assumed that this was somewhat short of a full general overhaul.
During the 1970's it would appear that some experiments took place into extending the periods that both phasing cases and scavenge blowers could run between overhauls. Phasing case 425 ran to 13,234 hours from 7/8/75 to 30/10/79 between general overhauls with 4 'light attention' exams at approximately 2,500 hour intervals. Phasing case 436 (currently fitted to triangle 423) ran to 11,986 hours from 30/12/75 to 5/2/79 between overhauls with 3 'light attention' exams after 6,500 hours had been run, these were at irregular intervals. Scavenge blower 430 ran to 12,672 hours from 5/11/74 to 18/2/80 between general overhauls with a 'light attention' exam at 11,000 hours in 1979.
The last phasing case to receive a full general overhaul was no. 450 (now fitted to triangle 413), this was completed on 10/7/81, in addition this case was not used on a triangle between 30/1/73 and 16/3/78 and must be considered as being in the best condition of the surviving cases. The last scavenge blower to receive a full general overhaul was no. 424, this was completed on 3/6/81 but was fitted to triangle 445 and this power unit was scrapped.
The series III phasing cases (538/539) were never fitted to series II triangles staying with their respective triangles for their whole lives. The series III scavenge blowers were interchanged with series II power units, although triangle 538 didn't lose its original blower until late 1979. There was an additional scavenge blower numbered 704, this was last fitted to triangle 446 which was scrapped.
It should be noted that 2 triangles were fitted with short life pistons during their final overhauls, power unit 415 had pistons fitted with a life expectancy of 2,784 hours during its Intermediate 'B' repair completed 10/2/1981. Triangle 424 had pistons with lives of 2,333 hours fitted during its Intermediate 'B' completed 21/1/1981, in addition the phasing case and scavenge blower were not overhauled and were also 'half-life' components. Some components fitted to other triangles in the last year of operation (1981) were already overdue overhaul and these were given negative life expectancies.
In conclusion, as at 2/1/82 most main generators which went on to be preserved had good or excellent life expectancies, the least being A146P fitted to triangle 434 which had a life expectancy of 5,764 hours as at 25/9/80 with well over a year of BR service ahead. The picture with the phasing cases and scavenge blowers is much more mixed with blower 428 already being 2,220 hours overdue overhaul when fitted to triangle 419 on 24/4/81. Power unit 449 had both phasing case and blower at 510 hours overdue overhaul as at 28/9/81. The outstanding candidate for the power unit in the best overall condition is unit 423, the last to receive a general repair and fitted with all components at 'zero' hours. Additionally, this unit has not accumulated further hours since 2/1/82. Unit 430 which received the penultimate general repair was fitted with a main generator which was not at 'zero' hours." (Carl Looker).

 

 

POWER UNIT 406

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

406

N/A

10/02/1981

N/A

N/A

PHASING CASE

453

10/02/1981

10/02/1981

5675hrs (04/09/1981)

1825

SCAVENGE BLOWER

416

10/02/1981

10/02/1981

5000hrs (10/02/1981)

0021

MAIN. GENERATOR

A120P

04/09/1981

07/08/1980

6647hrs (04/09/1981)

1825

  

POWER UNIT 407

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

407

N/A

28/11/1980

N/A

N/A

PHASING CASE

411

28/11/1980

28/11/1980

5000hrs (28/11/1980)

0024

SCAVENGE BLOWER

413

28/11/1980

28/11/1980

5000hrs (28/11/1980)

0024

MAIN. GENERATOR

A151P

28/11/1980

28/11/1980

10000hrs (28/11/1980)

0024

 

POWER UNIT 408

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

408

N/A

22/12/1978
N
ew pistons fitted 10/79 after 2021 hrs

N/A

N/A

PHASING CASE

429

16/01/1981

16/11/1979

2132hrs (16/01/1981)

5439

SCAVENGE BLOWER

450

29/10/1979

29/10/1979

10000hrs (29/10/1979)

2021

MAIN. GENERATOR

A144P

16/01/1981

16/01/1981

10000hrs (16/01/1981)

5439

 

POWER UNIT 413

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

413

N/A

02/09/1979

N/A

N/A

PHASING CASE

450

10/07/1981

10/07/1979

5000hrs (10/07/1981)

3942

SCAVENGE BLOWER

405

02/09/1979

02/09/1979

10000hrs (29/10/1979)

0000

MAIN. GENERATOR

A110P

23/09/1980

23/09/1980

8600hrs (10/07/1981)

3942

 

POWER UNIT 415

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

415

N/A

10/02/1979

N/A

N/A

PHASING CASE

426

12/11/1981

12/11/1981

5000hrs (12/11/1981)

0000

SCAVENGE BLOWER

412

12/11/1981

12/11/1981

10000hrs (12/11/1981)

0000

MAIN. GENERATOR

A143P

12/11/1981

12/11/1981

9437hrs (24/02/1981)

0563

 

POWER UNIT 417

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

417

N/A

30/11/1979

N/A

N/A

PHASING CASE

447

30/11/1979

30/11/1979

0436hrs (03/07/1981)

4564

SCAVENGE BLOWER

409

30/11/1979

30/11/1979

5000hrs (30/11/1979)

0000

MAIN. GENERATOR

A114P

30/11/1979

30/11/1979

5436hrs (03/07/1981)

4564

 

POWER UNIT 418

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

418

N/A

16/11/1979

N/A

N/A

PHASING CASE

431

19/12/1980

22/12/1978

-0309hrs (10/03/1981)

3323

SCAVENGE BLOWER

449

16/11/1979

16/11/1979

5000hrs (16/11/1979)

0000

MAIN. GENERATOR

NA881P

10/03/1981

02/04/1980

8094hrs (10/03/1981)

3323

 

POWER UNIT 419

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

419

N/A

09/04/1980

N/A

N/A

PHASING CASE

435

09/04/1980

09/04/1980

1732hrs (18/09/1981)

3268

SCAVENGE BLOWER

428

24/04/1981

05/03/1978

-2220hrs (24/04/1981)

3071

MAIN. GENERATOR

A125P

17/10/1980

07/10/1980

8353hrs (24/04/1981)

3071

 

POWER UNIT 423

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

423

N/A

08/05/1981

N/A

N/A

PHASING CASE

436

08/05/1981

08/05/1981

5000hrs (08/05/1981)

0014

SCAVENGE BLOWER

446

08/05/1981

08/05/1981

5000hrs (08/05/1981)

0014

MAIN. GENERATOR

A140P

08/05/1981

08/05/1981

10000hrs (08/05/1981)

0014

 

POWER UNIT 424

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

424

N/A

21/01/1981

N/A

N/A

PHASING CASE

424

18/11/1979

18/11/1979

2667hrs (21/01/1981)

0017

SCAVENGE BLOWER

434

18/11/1979

18/11/1979

5000hrs (18/11/1979)

-2333

MAIN. GENERATOR

A134P

21/01/1981

21/01/1981

10000hrs (21/01/1981)

0017

 

POWER UNIT 430

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

430

N/A

19/03/1981

N/A

N/A

PHASING CASE

428

19/03/1981

19/03/1981

5000hrs (19/03/1981)

0020

SCAVENGE BLOWER

427

19/03/1981

19/03/1981

5000hrs (19/03/1981)

0020

MAIN. GENERATOR

LA236P

19/03/1981

23/02/1980

7101hrs (19/03/1981)

0020

 

POWER UNIT 434

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

434

N/A

16/05/1979

N/A

N/A

PHASING CASE

423

16/05/1979

16/05/1979

5000hrs (16/05/1979)

0000

SCAVENGE BLOWER

403

16/05/1979

16/05/1979

10000hrs (16/05/1979)

0000

MAIN. GENERATOR

A146P

25/09/1980

18/07/1979

5764hrs (25/09/1980)

3696

 

POWER UNIT 439

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

439

N/A

28/06/1980

N/A

N/A

PHASING CASE

451

28/06/1980

28/06/1980

0671hrs (19/10/1981)

4329

SCAVENGE BLOWER

458

28/06/1980

28/06/1980

5000hrs (28/06/1980)

0000

MAIN. GENERATOR

A133P

19/10/1981

09/04/1980

5288hrs (19/10/1981)

4329

 

POWER UNIT 449

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

449

N/A

10/10/1979

N/A

N/A

PHASING CASE

437

10/10/1979

10/10/1979

-0510hrs (28/09/1981)

5510

SCAVENGE BLOWER

539

28/09/1981

10/10/1979

-0510hrs (28/09/1981)

5510

MAIN. GENERATOR

LA233P

28/09/1981

28/06/1980

5671hrs (28/09/1981)

5510

 

POWER UNIT 451

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

451

N/A

27/05/1980

N/A

N/A

PHASING CASE

427

20/08/1981

15/09/1978

4549hrs (20/08/1981)
After light attention

4032

SCAVENGE BLOWER

436

27/05/1980

21/05/1980

5000hrs (27/05/1980)

0018

MAIN. GENERATOR

LA235P

20/08/1981

13/12/1979

4769hrs (20/08/1981)

4032

 

POWER UNIT 457

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

457

N/A

05/08/1979

N/A

N/A

PHASING CASE

443

18/06/1981

18/06/1981

5000hrs (18/06/1981)

4424

SCAVENGE BLOWER

445

16/04/1980

16/04/1980

5000hrs (16/04/1980)

1454

MAIN. GENERATOR

A109P

10/09/1981

10/02/1981

8175hrs (10/09/1981)

4627

 

POWER UNIT 538

COMPONENT

SERIAL NO.

DATE FITTED TO TRIANGLE

LAST OVERHAUL

LIFE REMAINING

AT (DATE)

TRIANGLE HOURS

AT THIS DATE

TRIANGLE

538

N/A

18/12/1979

N/A

N/A

PHASING CASE

538

12/05/1972
earliest record

18/12/1979

5088hrs (28/08/1981)
After light attention

4912

SCAVENGE BLOWER

444

18/12/1979

18/12/1979

0088hrs (28/08/1981)

4912

MAIN. GENERATOR

A136P

28/08/1981

18/06/1981

9797hrs (28/08/1981)

4912